background image

6

GUARENTEE TERMS

Boiler without guarantee document.

Boiler fixed,repaired or adjusted by unauthorized services.

Boilers with rong type selection, wrong installing  and assembling,
boilers used wrong conditions and out of aim.

Problems  occured  while transportation, stocking or problems
occured under atmospheric conditions.

The problems occured by physical or chemical effects.

Wrong fuel selection and the problems occured by fuel conditions,

Wrong installation or connection fo the boiler to water and other
plumbing systems.

Weak flue (gas output) system.

The problems occured by scratching,touching to control and safety
systems of the boiler.

Cold water load while the boiler is hot.

Starting the boiler without water or required water in it.

In the terms of obeying the instructions,warnings, points in this manual

and the standards in charge (EN norms and directives must be applied if

mentioned standards are not in use) cast body is under 5 (five) and other

parts are under 2 (two) years guarantee. Alarko Carrier is responsible for

repairing or renewing if the following conditions are available.

Guarantee Document must be filled by the franchiser that you have bought
the boiler and must be send to Alarko Carrier.

Assembling and installing faults and problems, problems that will be
occured because of wrong upkeeping and working are not under guarantee.

Problems related to lime coating or/and any other materials coating and

corrosion on the heat transfer units of the boiler are not under guarantee

conditions.

Minimum life of these kind of products is mentioned as 15 (fifteen) years
by the minister of industry and commerce. Manufacturer and sales
companies are to supply all spare parts and services to the clients in
this period.

The problems happened by the following mentioned issues are out of
guarantee conditions

Содержание ADK 200

Страница 1: ...Operation Manual ADK 200 HEATING SYSTEM CAST IRON BOILERS WITH LIQUID GAS FUEL...

Страница 2: ...Kitap Revizyon Tarihi 310706 Kitap Bask Tarihi 310706 Kitap Revizyon No 1...

Страница 3: ...ADK 200 HEATING SYSTEM CAST IRON BOILERS WITH LIQUID GAS FUEL Operation Manual...

Страница 4: ......

Страница 5: ...leSingleBoilerHeatingCircuitWithWaterHeater Water Circulation Principal Instructions About Flue Instructions for Connecting the Fuel Tank Boiler Control Panels Electrical Diagrams Cast Iron Sections W...

Страница 6: ......

Страница 7: ...nical services Please do not touch or remove any parts of the boiler for starting adjusting or repairing the boiler except the processes written in this manual Please call Alarko Carrier services and...

Страница 8: ...l and the standards in charge EN norms and directives must be applied if mentioned standards are not in use cast body is under 5 five and other parts are under 2 two years guarantee Alarko Carrier is...

Страница 9: ...ter to the boiler or to the systen please wait for water temperature to come 40 C Circulation pump must surely be started while adding water to the system If not the sections may crack If the boiler w...

Страница 10: ...ontrols of ADK 200 boilers require profession In this manual the responsibilities and required information for users of the boiler is declared Besides these declared operations boiler must not be star...

Страница 11: ...h special alloy which is durable for heat extansions and changes EN GJL 200 They are long life boilers according to this special cast iron alloy With the help of vertical and three pass specially desi...

Страница 12: ...10 ADK 200 CAST IRON BOILER TECNICAL DATA...

Страница 13: ...11 ADK 200 CAST IRON BOILER DIMENSIONS...

Страница 14: ...ng advantages for operations If the boiler room area is not enough for this you can choose one side and leve the big empty space there Half of this empty space will be enough for the other side in the...

Страница 15: ...t in requested quality water addition from wells or other sources must be made after testing it For reaching the requested quality additional processes must be applied to the water if needed For avoid...

Страница 16: ...ioned as it is made by water heter with serpantine Instead of this exchanger with plate hot water acumulator can be used In that case the diagram will be different This diagram does not cancel the rel...

Страница 17: ...rrier ADK 200 boiler is designed forced circulation hot water heating systems only For healthy working conditions of the boiler temperature difference between water forward and water return must not b...

Страница 18: ...16 INSTRUCTIONS ABOUT FLUE...

Страница 19: ...el than the burner The height difference between the burner and fuel tank H must be more than 4 m In the seasons that the boiler is not used fuel tank must be empty for avoiding corrosion INSTRUCTIONS...

Страница 20: ...18 BOILER CONTROL PANELS...

Страница 21: ...19 ELECTRICAL DIAGRAMS...

Страница 22: ...dy of the boiler three times before thechimney exit transfering all usefull energy to the water inside the sections The optimized combustionchamber combined with perfect heat insulation provides maxim...

Страница 23: ...the terms of EN standards EN approved materials must be used in the system Burner control panel ecopanel etc Manufacturers or distrubutors warnings instruction manuals must be read Burner must not be...

Страница 24: ...ater must be loaded from the tap over the plumbing system to the boiler During the loading process all valves of the plumbing system and the radiators must be opened For preventing air fill to the sys...

Страница 25: ...because of technological reasons Cast iron boilers which are produced with human kind materials can be disposed of as follows INSTRUCTIONS FOR PRODUCT DISPOSAL Cast Iron Body Grey Cast Iron Through ir...

Страница 26: ...24 IMPORTANT Safety valve and expansion tank must be connected directly to the boiler and the place of use without using any valve between ADK 200 CAST IRON BODY BOILER CABIN PARTS LIST...

Страница 27: ...25 DIAGRAMS GASSIDERESISTANCE EXITFLUEGASRESISTANCE...

Страница 28: ...m Asecond key must be kept in safeplace for urgent matters Fuel tanks must be put in another place which is rounded by walls Natural air conditioning is needed for this place Boiler room must be air c...

Страница 29: ...e distance is doubled it means 400 mm The safe distance is to be doubled also in case that the combustibility degree of building material wasn t proved In LPG or liquid fuel use boiler room flue syste...

Страница 30: ...temperature for the boiler room must be 32 C Boiler room must be protected against freezing If natural airing system is used Ventilating aring system is used Bottom value shows the clean air input up...

Страница 31: ...led Boiler must not be started before repairing the connection if there is a problem Area must be properly air conditioned Gas valves must be checked as if they are on if gas fuel is used in the boile...

Страница 32: ...er In this case wait for the boiler to cool down and please make the following controls If the boiler doesn t start or if the safety thermostat stop the boiler again please call Alarko Carrier technic...

Страница 33: ...controls are important It is recommended that periodical controls for the boiler must be made by once in every three months These periodical controls are made by Alarko Carrier technicians by applying...

Страница 34: ...ntrols Working pressure test for burning adjustmenst with the flue gas measurement system if needed Sensors and connection of the sensors test Boiler burning room and possible soot layers on smoke cha...

Страница 35: ...n the burning room take turbulators out and clean horizontal smoke channels 2nd and 3rd pass Than clean the turbulator and put them in to the channels Close the burner door strictly In this cleaning o...

Страница 36: ...isolation plate is carried carefully and intensivly during transportation There is a ceramic rope fit in to the channels of isolation door This prevents leakages between isolation door and front sect...

Страница 37: ...TION Correct proper burner must be chosen according to gas to gas side resistance values of the boiler Alarko Carrier is not responsible for any possible problem if not certificated or out of standard...

Страница 38: ...9 30 ehit Fethibey Cad No 55 Kat 13 35210 Pasaport ZM R Tel 0232 483 25 60 Fax 0232 441 55 13 Ziyapa a Bulvar elik Ap No 25 5 6 01130 ADANA Tel 0322 457 62 23 Fax 0322 453 05 84 Metin Kasapo lu Cad K...

Отзывы: