32
Yearly Controls
Yearly controls of the boiler must be made by Alarko Carrier technicians before
the season starts. Flue and flue lines must be cleaned before calling technicians
for yearly controls. In yearly controls Alarko Carrier technicians apply the following
processes.
•
Situation and the leakproof of the sections and rope isolations controls.
•
Working pressure test for burning adjustmenst with the flue gas
measurement system if needed.
•
Sensors and connection of the sensors test.
•
Boiler burning room and possible soot layers on smoke channels are
checks and cleanings.
•
Connection and the leakproof of the boilers doors test.
•
Leakproof of the connections of the boiler test.
•
Valves tests for proper opening and closing.
•
Fuel filter test cleaning if needed.
•
Sensor of the burner liquids tests. Cleaning or renewing if needed.
•
Working and safety controls of burner and the boiler.
PACKING
Содержание ADK 200
Страница 1: ...Operation Manual ADK 200 HEATING SYSTEM CAST IRON BOILERS WITH LIQUID GAS FUEL...
Страница 2: ...Kitap Revizyon Tarihi 310706 Kitap Bask Tarihi 310706 Kitap Revizyon No 1...
Страница 3: ...ADK 200 HEATING SYSTEM CAST IRON BOILERS WITH LIQUID GAS FUEL Operation Manual...
Страница 4: ......
Страница 6: ......
Страница 12: ...10 ADK 200 CAST IRON BOILER TECNICAL DATA...
Страница 13: ...11 ADK 200 CAST IRON BOILER DIMENSIONS...
Страница 18: ...16 INSTRUCTIONS ABOUT FLUE...
Страница 20: ...18 BOILER CONTROL PANELS...
Страница 21: ...19 ELECTRICAL DIAGRAMS...
Страница 27: ...25 DIAGRAMS GASSIDERESISTANCE EXITFLUEGASRESISTANCE...