22
Unloading Water Of The Boiler
Plumbing and all radiator valves must be opened if the boilers water will be
unloaded. All the systems water can be unloaded by boilers drainage as if the
boiler is in the bottom of the system. If some part of heating system is under the
boiler room,unloading the water process can be made at a point at the bottom of
the system.
Loading Water To The Boiler
Water must be loaded from the tap over the plumbing system to the boiler. During
the loading process all valves of the plumbing system and the radiators must be
opened. For preventing air fill to the system this operation must be made slowly
and the stopper in the top must be opened. When water comes from this stopper
it means that the process is finished. Air must be taken from every radiator.
Water must be in quality which mentioned on Page 13,’’plumbing instructions’’.
Boiler must not be filled up with water when it is hot. This can cause cracks in
sections.
LOADING and UNLOADING BOILER WATER
Содержание ADK 200
Страница 1: ...Operation Manual ADK 200 HEATING SYSTEM CAST IRON BOILERS WITH LIQUID GAS FUEL...
Страница 2: ...Kitap Revizyon Tarihi 310706 Kitap Bask Tarihi 310706 Kitap Revizyon No 1...
Страница 3: ...ADK 200 HEATING SYSTEM CAST IRON BOILERS WITH LIQUID GAS FUEL Operation Manual...
Страница 4: ......
Страница 6: ......
Страница 12: ...10 ADK 200 CAST IRON BOILER TECNICAL DATA...
Страница 13: ...11 ADK 200 CAST IRON BOILER DIMENSIONS...
Страница 18: ...16 INSTRUCTIONS ABOUT FLUE...
Страница 20: ...18 BOILER CONTROL PANELS...
Страница 21: ...19 ELECTRICAL DIAGRAMS...
Страница 27: ...25 DIAGRAMS GASSIDERESISTANCE EXITFLUEGASRESISTANCE...