Shenzhen Aituo Automation Device Co.,Ltd
25
station .When the machine not work, power off the soldering station, to ensure the life of
solderingiron
head;
2, Before start the machine , check the machine pressure, normal working pressure is 0.5 KG,
if air pressure is lower than 0.45 KG, the machine can not properly working, it needs to stop;
3.Please note: when in training operator, pay more attention to the following points
when soldering is in abnormal situation, the soldering iron head push down, don’t
immediately shut off the power, but shut off the air pressure supplier first, after lifting the
soldering iron head, power off the electronic supplier, after seconds,then open the air pressure
supplier, open the power supplier again.
Debugging cylinder stroke must be used two open spanner, first fixed a screw then tighten.
Training step
1
、
Positioning connector:As follow picture,the soldering station to adjust cylinder nut and
push the connector to the appropriate position.
2
、
Poistioning soldering iron head:At the soldering station,to adjust the soldering iron head
and make the full coverof the connector soldering point.(as follow picture)
Содержание AM121 Series
Страница 13: ...Shenzhen Aituo Automation Device Co Ltd 13...