
En-14
(2) Temporarily fasten the connection cable along the connection pipe with vinyl tape.
(Wrap to about 1/3 the width of the tape from the bottom of the pipe so that water
does not enter.)
Wall pipe
Drain hose
Connection pipe
Connection cable –
Power supply cable
Transmission cable
EV kit cable
(3) Securely fasten the EV kit cable to the indoor unit pipe.
(4) Conceal the tube protecting the EV kit connector with the product, etc., so that the
customer cannot access it.
(5) Fasten the connection pipe to the outside wall with saddles, etc.
Saddle*
Pipe
Outside wall cap*
Sealer putty*
(Outdoors)
Wall
*Field supply
(6) Fill the gap between the outside wall pipe hole and the pipe with sealer so that rain
water and wind cannot blow in.
(7) Install the front panel.
• First
fi
t the lower part of the front panel, and insert top and bottom hooks. (3 top
sides, 6 bottom sides)
Bottom hooks
(6 position)
Indoor unit
Bottom hole
(6 position)
Front panel
Top hooks (2 sides)
Top holes (2 sides)
Top hole (Center)
Indoor unit
Top hook (Center)
Front panel
• Attach the 4 screws.
(8) Install the intake grille.
• The
fi
xing axle of the intake grille is installed on the Panel.
• Lay down the intake grille.
(9) Fasten the drain hose to the outside wall, etc.
Check the condition of the drain hose and make sure that it is routed correctly.
GOOD
End in water
Drain
hose
Saddle
Lifted up
Wave
PROHIBITED
CAUTION
Make sure the drain water is properly drained.
8. TEST RUN
8.1. Test run using Outdoor unit (PCB)
• Refer to the Installation Manual for the outdoor unit if the PCB for the outdoor unit is to
be used for the test run.
8.2. Test run using Remote Controller
• Refer to the Installation Manual for the remote controller to perform the test run using
the remote controller.
• When the air conditioner is being test run, the OPERATION and TIMER indicator lamps
fl
ash slowly at the same time.
9. CHECK LIST
Pay special attention to the check items below when installing the indoor unit(s). After instal-
lation is complete, be sure to check the following check items again.
CHECK ITEMS
If not performed correctly
CHECK
BOX
Has the indoor unit been installed
correctly?
Vibration, noise, indoor unit may
drop
Has there been a check for gas leaks
(refrigerant pipes)?
No cooling, No heating
Has heat insulation work been
completed?
Water leakage
Does water drain easily from the indoor
units?
Water leakage
Is the voltage of the power source the
same as that indicated on the label on
the indoor unit?
No operation, heat or burn
damage
Are the wires and pipes all connected
completely?
No operation, heat or burn
damage
Is the indoor unit earthed (grounded)?
Short circuit
Is the connection cable the specified
thickness?
No operation, heat or burn
damage
Are the inlets and outlets free of any
obstacles?
No cooling, No heating
Does start and stop air conditioner
operation by remote control unit or
external device?
No operation
After installation is completed, has the
proper operation and handling been
explained to the user?
Is the EV kit connected?
No cooling, No heating
9377773098-01_IM.indb 14
9377773098-01_IM.indb 14
7/12/2012 3:05:27 PM
7/12/2012 3:05:27 PM
Содержание ASHE07GACH
Страница 17: ...9377773098 01_IM indb 16 9377773098 01_IM indb 16 7 12 2012 3 05 29 PM 7 12 2012 3 05 29 PM...
Страница 33: ...9377773098 01_IM indb 16 9377773098 01_IM indb 16 7 12 2012 3 05 36 PM 7 12 2012 3 05 36 PM...
Страница 49: ...9377773098 01_IM indb 16 9377773098 01_IM indb 16 7 12 2012 3 05 43 PM 7 12 2012 3 05 43 PM...
Страница 65: ...9377773098 01_IM indb 16 9377773098 01_IM indb 16 7 12 2012 3 05 51 PM 7 12 2012 3 05 51 PM...
Страница 81: ...9377773098 01_IM indb 16 9377773098 01_IM indb 16 7 12 2012 3 05 58 PM 7 12 2012 3 05 58 PM...
Страница 97: ...9377773098 01_IM indb 16 9377773098 01_IM indb 16 7 12 2012 3 06 06 PM 7 12 2012 3 06 06 PM...
Страница 113: ...9377773098 01_IM indb 16 9377773098 01_IM indb 16 7 12 2012 3 06 14 PM 7 12 2012 3 06 14 PM...
Страница 129: ...9377773098 01_IM indb 16 9377773098 01_IM indb 16 7 12 2012 3 06 22 PM 7 12 2012 3 06 22 PM...