3-4 ELECTRONIC EXPANSION VALVE CONTROL
03-09
3-5 DRAIN PUMP OPERATION
1. Initialization
2. Operation Control
When starting up
Automatic operatic control
Automatic PI control is performed based on the indoor unit heat exchanger outlet temp and inlet temp.
Room temperature control
The room temperature is controlled so that it reaches to the set-up temperature based on the difference
between the room temperature and the set-up temperature, and the change of indoor unit temperature.
if the room temperature becomes 0.5 C lower than the set-up temperature, EEV is fully closed.
3. Special Control
(1) When cooling and refrigerant circulation starts, the drain pump starts simultaneously.
(2) The drain pump operates continuously for 3 minutes after the refrigerant circulation stopped.
(3) When the refrigent circulation is stopped by a start of indoor heat exchanger frost prevention
operation, the drain pump will turn off in 1 hour after the end of indoor heat exchanger frost
prevention operation.
(4) When the water level in the drain pan rises up and then the float switch functions:
Microcomputer stops the refrigerant circulation and indoor fan motor operation.
Drain pump operates continuously for 3 minutes after the float switch is turned off.
(Almost condensing water may be drained)
(5) When the float switch turns ON continuously for 3 minutes, 'FAILURE INDICATION' operates.
(6) When the float switch turns OFF within 3 minutes, the unit starts cooling operation.
1
2
When the power is turned ON.
When it has passed the limited time since the last initialization.
When indoor unit stopping
Oil recovery operation : Controlled pulse.
Test run operation : Controlled pulse.
Icing protection control : Fully closed.
Pump down operation : Fully open.
Defrost operation : Controlled pulse
Outdoor unit Condition
EEV Condition
Cooling
Heating
Fully closed
Slightly open
(Cooling) Move to the cooling control base pulse in steps.
(Heating) Move to the heating control base pulse in steps.
OFF
Fully closed
Содержание ARXB07LALH
Страница 1: ...Small VRF system for light commercial and home use SERVICE MANUAL...
Страница 2: ......
Страница 6: ......
Страница 7: ...1 TEST RUN...
Страница 8: ......
Страница 27: ...2 OUTDOOR UNIT OPERATION CONTROL...
Страница 28: ......
Страница 42: ......
Страница 43: ...3 INDOOR UNIT OPERATION...
Страница 44: ......
Страница 63: ...4 TROUBLE SHOOTING...
Страница 74: ......
Страница 171: ...5 APPENDING DATA UNIT...
Страница 172: ......
Страница 174: ...05 02 5 2 WIRING DIAGRAM 5 2 1 Indoor Unit MODELS AUXB07 09 12 14 18 24LALH...
Страница 175: ...05 03 MODELS AUXD18 24LALH AUXA30 36 45 54LALH...
Страница 176: ...05 04 MODELS ARXB07 09 12 14 18LALH...
Страница 177: ...05 05 MODEL ARXB24LATH MODELS ARXB30 36LATH...
Страница 178: ...05 06 MODEL ARXB45LATH...
Страница 179: ...05 07 MODEL ARXA24LATH MODELS ARXA30 36 45LATH...
Страница 180: ...MODELS ARXC36 45LATH 05 08...
Страница 181: ...05 09 MODELS ARXD07 09 12 14 18 24LATH...
Страница 182: ...MODELS AB A12 14 18 24LBTH 05 10...
Страница 183: ...05 11 MODELS AB A30 36 45 54LBTH...
Страница 184: ...MODELS AS A07 09 12 14LACH 05 12...
Страница 185: ...MODELS AS E07 09 12 14LACH 05 13...
Страница 186: ...MODELS AS A18 24 30LACH 05 14...
Страница 187: ...05 15 MODELS AJ A36 45 54LALH 5 2 2 Outdoor Unit...
Страница 192: ......
Страница 193: ...6 DISASSEMBLY PROCESS...
Страница 194: ......