AirSynergy3 Equipment Installation Guide
Page 9 | Commercial in Confidence SYN-UG-018
1 About this Guide
This section discusses the purpose, intended audience, conventions, referenced documentation and
organisation for this guide.
1.1 Purpose
This guide provides the workflow and step-by-step procedures for Installation of the AirSynergy
equipment. These procedures include:
Verify Prerequisites
Install the AirSynergy3 Radio equipment
Install the PSU equipment
Connect and manage cables
Commission and discover via Netspan, to be ready for full configuration
1.2 Intended Audience
This guide is intended for persons who are responsible for installing AirSynergy equipment. These
persons should have a working knowledge of the equipment.
1.3 Conventions
This document uses the following informational conventions.
Icon
Description
Checkpoint:
Marks a point in the workflow where there may be an exit or branch
to some other procedure. At each
Checkpoint
the reason for an exit or branch is
given along with specific directions to locate the entry point in the other
procedure.
Reference:
Gives a resource in the workflow that may be needed to complete a
procedure along with specific directions to use the resource.
Caution:
Describes a possible risk and how to lessen or avoid the risk.
Advice:
Provides a recommendation based on best practice.
Note:
Provides useful information.