AirSynergy3 Equipment Installation Guide
Page 36 | Commercial in Confidence SYN-UG-018
Figure 45 – Cable gland and connector body positioned on the drop cable.
5.2.3 Thread the prepared cable end through the gland, washer, sealing ring and body of the
connector
Figure 46 – Fit the cable ends into the connector and secure
5.2.4 Secure the prepared ends of the drop cable into the head part of the connector (The male part
with pins visible). The connection scheme follows:
Drop cable black
– position 1 (in male connector part)
Drop cable blue
– position 2 (in male connector part)
Figure 47 – Male part of connector with both drop cable wires fitted