AirSynergy3 Equipment Installation Guide
Page 53 | Commercial in Confidence SYN-UG-018
Note: When securing back to back assembly to the mounting plate a safety line or
rope should be secured to the units. The 6mm tapped holes used for the
protection ground at the bottom or the GPS mountings at the top of each Synergy
unit provide strong anchor points for a safety line. (This is the same point used
for protection ground connection in exposed areas or high lightening risk areas)
Figure 70
– M6 Screw fixing point as safety line anchor point