![Airspan AirSynergy3 Скачать руководство пользователя страница 17](http://html.mh-extra.com/html/airspan/airsynergy3/airsynergy3_installation-manual_2879155017.webp)
AirSynergy3 Equipment Installation Guide
Page 17 | Commercial in Confidence SYN-UG-018
Additionally required for back to
back unit installations.
Note: Dual radio Synergy3 units
in most cases pre-assembled
from the factory
1 x back to back joining kit
4 joining straps with mounting
studs and flange nuts pre-fitted.
16 M5 countersink screws
1 x Extended sun shield ( If no
front mount antenna is to be
fitted to the front face of the
back to back AirSynergy units)
OPTIONAL Heavy-
duty mounting (for
specific mounting
locations)
1 heavy-duty pole clamp
mounting kit
4 clamps
4 M8x150 bolts
4 M8 plain washer
4 M8 spring washer
Connecting cables
CAT5e
External grade 30m with
Synergy3 compatible RJ45
connector weather hood pre-
fitted. One for each AirSynergy
unit unless iBridge backhaul
invoked
Earthing cable
M6 Lug at each end ( for the
Power Supply and
power cable
48V PSU module
1 per AirSynergy unit (or dual
radio unit)
Power drop cable
1 per AirSynergy unit (or dual
radio unit) with external grade
30m power cable with Synergy3
compatible power connector
weather hood pre-fitted.
Cable join kit
1 per AirSynergy unit (or dual
radio unit)
48V PSU in weatherproof
enclosure (NEMA approved)
Alternative to the standard 48V
PSU and is required for all North
American installations