Chapter 2 Installation and Setup
AirMux-200
Installation and Operation Manual
2-2 Package
Contents
2.2 Site Requirements and Prerequisites
For the IDU, allow at least 90 cm (36 in) of frontal clearance for operating and
maintenance accessibility. Allow at least 10 cm (4 in) clearance at the rear of the
unit for signal lines and interface cables.
The ambient operating temperature should be –45 to 60
°
C/-49 to 140
°
F (ODU),
or -5 to 45
°
C/23 to 113
°
F (IDU) at a relative humidity of up to 90%,
non-condensing.
Before starting the installation, refer to the
Link Budget Calculator
utility found on
the Last Mile CD-Rom, in order to calculate the expected performance of the link,
operating at your system requirements.
2.3 Package Contents
The AirMux-200 packages include the following items:
ODU Package Containing:
•
ODU
•
Mast/Wall mounting kit plus mounting instructions
•
AIRMUX-200 Manager installation CD
•
Spare RJ-45 Connector
IDU Package Containing:
•
IDU
•
110V/220V adaptor
•
IDU wall-mounting drilling template
•
Self adhesive label showing the IDU LED operation
•
Spare RJ-45 Connector
External antenna (if ordered)
ODU/IDU Cable at length ordered (optional)
Last Mile Technical Documentation CD
Содержание Airmux-200
Страница 1: ...AirMux 200 Installation and Operation Manual Point to Point Wireless TDM IP Multiplexer ...
Страница 2: ......
Страница 18: ...Table of Contents iv AirMux 200 Installation and Operation Manual ...
Страница 24: ...Chapter 1 Introduction AirMux 200 Installation and Operation Manual 1 6 Technical Specifications ...
Страница 40: ...Chapter 2 Installation and Setup AirMux 200 Installation and Operation Manual 2 16 Installation and Setup ...