Feniks STUDENT Instruction Manual, No.
033-02-100
edition
IA
, 2012, page
19
of
38
AIR-POL Sp. z o.o.
– 05-120 Legionowo, ul. Olszankowa 52, www.air-pol.com.pl
tel.: (+4822) 774 0711, (+4822) 784 1595, (+4822) 774 4832, fax (+4822) 784 9640, @: [email protected]
Fot. 38
34.
Thread the temporary line through the eyes of
flaps Nos. 5 and 6, and block the closing loop
with the formerly removed temporary closing
pin.
Fot. 39
35.
Thread the RSL line pin through the handle
line loop, and place it in the closing loop after
having removed the temporary closing pin.
The RSL system closing pin eye should be
located at an approximate distance of 5 mm
from the flap eye edge.
36.
Attach the Velcro tape of the line with the
closing pin placed on the upper flap.
37.
Seal the parachute with sealing thread
NSN-8310-01-493-6030
sealing thread, break
resistance no higher than 2.15 kg (4.75 lbs).
Fot. 40
38.
Close the closing pin protective flap by
placing its edges (16) under flap No. 5.
Place the lower part of the protective flap in
the pouch/casing (17) on flap No. 6.
Fot. 41
39.
Shape the reserve parachute closed in the
container by pressing against it gently and
smoothly with your knees or hands. Use a
rigging ruler if necessary.
ATTENTION!
After you finish packing, count your tools.
Their number has to be identical to the
number you began packing with!
16
17