Feniks STUDENT Instruction Manual, No.
033-02-100
edition
IA
, 2012, page
12
of
38
AIR-POL Sp. z o.o.
– 05-120 Legionowo, ul. Olszankowa 52, www.air-pol.com.pl
tel.: (+4822) 774 0711, (+4822) 784 1595, (+4822) 774 4832, fax (+4822) 784 9640, @: [email protected]
Fot. 11
3.
Place the deployment handle in the pouch
firmly, and secure it with Velcro tape.
4.
Place the line in the protective casing.
Fot. 12
5.
Tie a granny knot to connect the RSL tape to
the line with the pin.
Fot. 13
6.
If using the “Smart Loop” system, attach a
line with “Smart Loops” to the RSL tape. The
larger loop should remain free.
Fot. 14
7.
Place the RSL tape in the container. The part
with the carabineer should be placed against
the riser ring. The part with the closing pin
(and the “Smart Loop” line) should be placed
against the reserve parachute container.
After you finish assembly, check whether the
tape is free of twists, firmly secured with
Velcro tape, and properly wrapped in the
casing.
Fot. 15
8.
Fasten the RSL carabineer temporarily on the
riser ring on the inner side of the harness.
ATTENTION!
The entire system MUST be placed under reserve
parachute risers, allowing system release from the
container on the inner side of the harness.