Page 34 of 83
SK2018 PCG(H)-V/P-AECM-001
Installation Procedures:
1.
Lift unit (without front panel) with care by four corners only. Do not lift unit by the condensate drain discharge pipe or
piping connections.
2.
Incline the unit and insert it into ceiling. Insert support rods into the bracket slot.
3.
Remove some T bars if necessary to achieve enough clearance.
4.
Line up the unit to the supporting bars of the ceiling by tightening the nuts and counter nuts of the suspension rods
5.
After connecting the condensate drain piping and piping connections, confirm fan coil is level.
6.
Check to ensure the unit is level. Drain will at the lowest point when unit is level.
7.
Tighten nuts on the suspended rods.
For Single Fan Unit:
Содержание SUPERIOR PCG-04-V
Страница 1: ...SK2018 PCG H V P AECM 001 ...
Страница 36: ...Page 35 of 83 SK2018 PCG H V P AECM 001 For Twin Fan Unit ...
Страница 85: ...Page 84 of 83 SK2018 PCG H V P AECM 001 ...