Page 25 of 83
SK2018 PCG(H)-V/P-AECM-001
B.3.
Operating Limits
Power supplies
Code
Volt
Phase
Hz
X
220
1
60
Y
115
1
60
Water circuit
Minimum entering water temperature
35.6 °F
Maximum entering water temperature
176 °F
Coil tested maximum pressure
232 psi
B.4.
Before Installation
The installation site must be established by the system designer or other qualified professional, taking account of the
technical requisites and current standards and regulations.
Cassette fan coil units must be installed by qualified personnel only.
Cassette fan coil units are designed for installation in a false ceiling, for intake of fresh air from outside and for diverting a
small part of the treated air into a neighboring room.
They must be installed in such a way as to enable treated air to circulate throughout the room and allow the minimum
distances required for technical maintenance operations.
It is advisable to place the unit close to the installation site without removing it from packaging.
Do not put heavy tools or weights on packaging.
Upon receipt, the unit and the packaging must be checked for damage sustained in transit and if necessary, a damage
claim must be filed with the shipping company.
Check immediately for installation accessories inside the packaging.
Do not lift unit by the condensate drain discharge pipe or by the water connections or front panel; lift the unit using four
mounting brackets. (Figure B.4.1)
Check and note the unit serial number.
Figure B.4.1
Brackets
Содержание SUPERIOR PCG-04-V
Страница 1: ...SK2018 PCG H V P AECM 001 ...
Страница 36: ...Page 35 of 83 SK2018 PCG H V P AECM 001 For Twin Fan Unit ...
Страница 85: ...Page 84 of 83 SK2018 PCG H V P AECM 001 ...