Appendices and Forms
Appendix A
Requirements for Certification of ICM Heat Pump Ratings .................................. 20
Appendix B
Condenser Curve Information .............................................................................. 22
Appendix C
Condensing Units for Coil Only Certification ........................................................ 28
Appendix D
Compliance Program Flow Charts ........................................................................ 30
Appendix E
Independent Coil Manufacturer BMG Definitions ................................................. 38
Appendix F
Setup, Commissioning and Operating Checklist for Laboratory Personnel ......... 39
Appendix G
Coil Geometry Screening ..................................................................................... 40
Appendix H
Uniform Test Method for Measuring the Energy Consumption of
Central Air Conditioners and Heat Pumps
– Normative ....................................... 44
APPENDIX I
Secondary Capacity Check Requirements ........................................................... 67
Содержание OM 210
Страница 8: ......
Страница 37: ...USE OM JANUARY 2017 29 Figure C2 Use of Unqualified Outdoor Units for ICM Testing ...
Страница 50: ...USE OM JANUARY 2017 42 Figure G2 Part 2 of the ORNL Flowchart ...
Страница 55: ...USE OM JANUARY 2017 47 Figure K1 Nozzle Combination Tests 66 Figure K2 Passive Pressure Drop Device 75 ...