USE OM - JANUARY 2017
19
manufactured after the effective date of March 1, 2015. The Participant shall provide a method of
determining the date of manufacture upon request.
5.13.2
Condenser Characteristics
. Participants shall identify the regions that the condenser
is eligible for installation in the “Regions” field of the Condenser Characteristics.
5.13.2.1
Regional Standards for Single Line Add/Edits
. If a Participant submits a
single line new/edit to the Directory via the input interface that would alter the region
where the model can be installed, the Directory shall prevent the ratings from being
added. Participants shall edit the region field in the condenser characteristics table,
and resubmit the listings. The data shall be published and sent to DOE after the
Directory overnight process, on the date of the submission.
5.13.2.2
Regional Standards for Mass Upload Add/Edits
. If a Participant submits a
mass upload of new/edit listings to the Directory via the input interface that would alter
the region where the model can be installed, the Directory shall prevent the ratings
from being added. An email shall be sent listing the invalid submissions. Participants
shall edit the region field in the condenser characteristics table, and then resubmit the
listings. The data shall be published and sent to DOE after the Directory overnight
process, on the date of the submission.
5.13.2.3
Regional Efficiency Range
. When a Participant is adding or editing model
listings, the Directory shall validate whether the new rating exceeds the range specified
on the condenser characteristics table. For ratings submitted that exceed the regional
efficiency range, the Directory shall prevent the ratings from being added. Participants
shall edit the range for SEER and/or HSPF in the condenser characteristics table, and
then resubmit the listings to enter the listings in.
Note: The ranges provided in the condenser characteristics table shall only be used
for validation purposes, the FTC EnergyGuide label generated from the Directory shall
determine the range automatically from the data in the Directory and place it on the
label.
6. Assessment and Payment of Certification Fees
Except as noted below, the assessment and payment of certification fees shall proceed according to
the AHRI General Operations Manual, Section 12.
6.1
Equipment Delivery/Disposal Fees
. The Participant is responsible for the delivery and expenses
associated with shipping test samples to the Laboratory. However, following the completion of the test, the
sample shall be shipped prepaid by AHRI to the destination specified by the Participant. The Participant
shall provide instruction to the Laboratory regarding the disposal/shipment of the sample(s).
7. Issuance of Violations and/or Termination
Refer to Section 14 of the AHRI General Operations Manual.
8. Program Hierarchy, Complaints, and the Appeals Process
Refer to Section 15 of the AHRI General Operations Manual.
9. Proper Use of the AHRI Certification Mark and Claims to Certification
Refer to the AHRI Brand Usage Manual.
Содержание OM 210
Страница 8: ......
Страница 37: ...USE OM JANUARY 2017 29 Figure C2 Use of Unqualified Outdoor Units for ICM Testing ...
Страница 50: ...USE OM JANUARY 2017 42 Figure G2 Part 2 of the ORNL Flowchart ...
Страница 55: ...USE OM JANUARY 2017 47 Figure K1 Nozzle Combination Tests 66 Figure K2 Passive Pressure Drop Device 75 ...