USE OM - JANUARY 2017
40
APPENDIX G
– COIL GEOMETRY SCREENING
1.
Information regarding the mixed Indoor Unit may be verified by the matched System Manufacturer.
2.
Single-Speed & Single-Stage Mixed Coil Requirements
A.
ICM ratings shall be subject to the flowchart shown in Figure G1, G2 and G3.
B.
If the
sample’s ratings pass the criteria of the flowchart, the ratings are subject to the coil geometry screening
program. The program shall generate a rating based on submitted data from the ICM. This rating is then
compared with the System M
anufacturer’s inputted data. The ratings of the mixed coil shall not exceed 6% of
the output rating generated by the coil geometry screening program.
C.
Participants have the option to perform an AHRI test at the Laboratory in addition to their yearly testing
requirements, to add a rating that does not meet the aforementioned criteria.
Содержание OM 210
Страница 8: ......
Страница 37: ...USE OM JANUARY 2017 29 Figure C2 Use of Unqualified Outdoor Units for ICM Testing ...
Страница 50: ...USE OM JANUARY 2017 42 Figure G2 Part 2 of the ORNL Flowchart ...
Страница 55: ...USE OM JANUARY 2017 47 Figure K1 Nozzle Combination Tests 66 Figure K2 Passive Pressure Drop Device 75 ...