16
107110-01 - 6/16
• DuraVent PolyPro - ULC S636 listed Polypropylene special gas vent system.
• Selkirk Polyflue - ULC S636 listed Polypropylene special gas vent system.
• Centrotherm InnoFlue SW - ULC S636 listed Polypropylene special gas vent system.
Use PVC and/or CPVC for the air intake system. PVC may be used for all air intake piping between the intake terminal
and the boiler.
When CPVC and/or PVC pipe is used, it must be joined using primer and cement that is listed for use with the pipe
material being joined (PVC, CPVC, or CPVC to PVC).
2. Vent Components Supplied with this Boiler – This boiler is supplied with some of the components needed for 3” CPVC/PVC
venting (Vent Option 2). A list of these components is supplied in Table 7.26. Components not supplied may be procured
locally. The CPVC Pipe and elbow supplied with this boiler are not listed to ULC S636 and may not be used in Canada.
3. Maximum Vent and Air Intake Lengths - The maximum length of the vent air intake piping depends upon the vent option
selected and the boiler size.
See Tables 7.5, 7.13 or 7.21
for the maximum vent lengths. These maximum lengths apply
to both the vent and intake piping (e.g. Option 1 may have up to 60ft of intake and 60ft of vent piping). For all vent
systems, the lengths shown in Tables 7.5, 7.13 and 7.21 are in addition to the first 90° elbow. If more elbows are desired,
the maximum allowable vent length must be reduced by the amount shown in Table 7.1 for each additional elbow used.
Termination fittings are never counted.
The elbows supplied with the boiler are “standard radius” elbows. It is recommended that all field supplied PVC or
CPVC elbows be “1/4 Bend” (Sanitary 90° Elbow) or “Long Sweep 1/4 Bend” type elbows (Figure 7.2). In this manual
“sanitary” and “long sweep” elbows are treated as having the same equivalent length.
Example:
A 3” twin pipe horizontal CPVC/PVC vent system is planned for a horizontally vented 120MBH model which has the
following components in the vent system:
•
1 ft CPVC Straight Pipe
•
90 CPVC Elbow (short bend)
•
1-1/2 ft CPVC Straight Pipe
•
Coupling
•
10 ft PVC Straight Pipe
•
90 PVC Elbow (Sanitary Elbow Design)
•
15 ft PVC Straight Pipe
•
PVC Coupling Terminal
The Vent Option #2 column in Table 7.5 describes a horizontal direct vent system using 3” CPVC and PVC pipe. From this
column, we see that the boiler may have a vent length of up to 135ft. The first CPVC 90 degree elbow is not considered. From
Table 7.1, we see that the equivalent length of the 90 PVC elbow is 4ft and that the equivalent length of the coupling is 0ft.
The total equivalent length of the planned venting system is therefore:
1ft (Straight CPVC) + 0ft (first short bend CPVC 90 Elbow) + 1.5ft (Straight CPVC) + 0ft (Coupling) + 10ft (Straight PVC)
+ 4ft (PVC 90 Sanitary Elbow) + 15ft (Straight PVC) + 0ft (Coupling Terminal) = 31.5ft.
Since Table 7.1 shows a maximum allowable vent length of 135ft, the planned vent system length is acceptable
The flex venting used on some of the Vertical Twin Pipe and Split Vent Options also reduces the maximum allowable vent
length. See Sections VII-C or VII-D for details.
Vii. Venting
A. Vent System Design (continued)
nOTiCE
Do not exceed maximum vent/combustion air system length. Refer to Tables 7.1 and 7.13 in this
section for maximum vent/combustion air system length.
Use only vent and combustion air terminals and terminal locations shown in Tables 7.1 and 7.13 and
related Figures in this section.
Содержание K2WT
Страница 11: ...11 107110 01 6 16 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued ...
Страница 72: ...72 Figure 9 6 Piping Method 1 Near Boiler Piping Shaded Boiler Loop IX System Piping continued ...
Страница 82: ...82 107110 01 6 16 Figure 10 4 Proper Installation of Header Sensor X Wiring continued ...
Страница 83: ...83 107110 01 6 16 X Wiring continued Figure 10 5 Internal Ladder Diagram ...
Страница 84: ...84 107110 01 6 16 X Wiring continued ...
Страница 85: ...85 107110 01 6 16 Figure 10 6 Internal Wiring Connections Diagram X Wiring continued ...
Страница 87: ...87 107110 01 6 16 Figure 10 8 TACO SR504 or Equivalent Zone Panel Wiring Connection Diagram X Wiring continued ...
Страница 88: ...88 107110 01 6 16 X Wiring continued Figure 10 9 Sage Zone Control Circulator Panel Wiring Connection Diagram ...
Страница 95: ...95 107110 01 6 16 Lighting and Operating Instructions XI Start Up and Checkout continued ...
Страница 140: ...140 107110 01 6 16 XV Repair Parts continued ...
Страница 142: ...142 107110 01 6 16 XV Repair Parts continued ...
Страница 146: ...146 107110 01 6 16 XV Repair Parts continued ...
Страница 148: ...148 107110 01 6 16 XV Repair Parts continued ...
Страница 161: ...161 107110 01 6 16 ...
Страница 162: ...162 107110 01 6 16 ...
Страница 163: ...163 107110 01 6 16 ...
Страница 164: ...164 107110 01 6 16 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...