115
107110-01 - 6/16
XII. Operation
F. Changing Adjustable Parameters (continued)
Multiple boilers IWH Piped to Primary, Optional Domestic Hot Water Priority
Sequencer Master
(Boiler 1)
Boiler 2
Wiring locations:
Thermostat
X
DHW call for heat
X
System pump
X
DHW pump
X
Boiler Pump
X
X
Sequencer Master Parameter Selections:
Sequencer Master
Enabled
Indirect Water
Heater
“Primary Piped”
Pump Parameter Selections:
System Pump =
Central Heat,
Optional Priority
Never
Boiler Pump =
Any demand
Any
demand
DHW Pump =
Primary Loop
Piped IWH
Never
Explanation:
This piping arrangement permits the system pump to run or not run when there is a domestic hot water call for heat. Domestic hot water
priority is optional. It is permissible for the domestic and system pumps to run at the same time. The boiler pump must run for every call for
heat.
Example Pump Parameter selections (continued):
Sequencer Master
(Boiler 1)
Boiler 2
Wiring locations:
Thermostat
X
DHW call for heat
X
System pump
X
DHW pump
X
Boiler Pump
X
X
Sequencer Master Parameter Selections:
Sequencer Master
Enabled
Indirect Water
Heater
“Primary Piped”
Pump Parameter Selections:
System Pump =
Any demand
Never
Boiler Pump =
Any demand
Any demand
DHW Pump =
Primary Loop
Piped IWH
Never
Explanation:
This piping arrangement requires the system pump to be running for any calls for heat. Also the boiler pump must run for any call for heat.
Multiple Boilers, IWH piped to primary, system pump required to run for any call for heat
Содержание K2WT
Страница 11: ...11 107110 01 6 16 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued ...
Страница 72: ...72 Figure 9 6 Piping Method 1 Near Boiler Piping Shaded Boiler Loop IX System Piping continued ...
Страница 82: ...82 107110 01 6 16 Figure 10 4 Proper Installation of Header Sensor X Wiring continued ...
Страница 83: ...83 107110 01 6 16 X Wiring continued Figure 10 5 Internal Ladder Diagram ...
Страница 84: ...84 107110 01 6 16 X Wiring continued ...
Страница 85: ...85 107110 01 6 16 Figure 10 6 Internal Wiring Connections Diagram X Wiring continued ...
Страница 87: ...87 107110 01 6 16 Figure 10 8 TACO SR504 or Equivalent Zone Panel Wiring Connection Diagram X Wiring continued ...
Страница 88: ...88 107110 01 6 16 X Wiring continued Figure 10 9 Sage Zone Control Circulator Panel Wiring Connection Diagram ...
Страница 95: ...95 107110 01 6 16 Lighting and Operating Instructions XI Start Up and Checkout continued ...
Страница 140: ...140 107110 01 6 16 XV Repair Parts continued ...
Страница 142: ...142 107110 01 6 16 XV Repair Parts continued ...
Страница 146: ...146 107110 01 6 16 XV Repair Parts continued ...
Страница 148: ...148 107110 01 6 16 XV Repair Parts continued ...
Страница 161: ...161 107110 01 6 16 ...
Страница 162: ...162 107110 01 6 16 ...
Страница 163: ...163 107110 01 6 16 ...
Страница 164: ...164 107110 01 6 16 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...