126
107110-01 - 6/16
XIII. Service and Maintenance
(continued)
Warning
This boiler must only be serviced and repaired by skilled and experienced service technicians.
If any controls are replaced, they must be replaced with identical models.
read, understand and follow all the instructions and warnings contained in all the sections of this
manual.
If any electrical wires are disconnected during service, clearly label the wires and assure that the wires
are reconnected properly.
Never jump out or bypass any safety or operating control or component of this boiler.
Assure that all safety and operating controls and components are operating properly before placing
the boiler back in service.
Annually inspect all vent gaskets and replace any exhibiting damage or deterioration.
Burn Hazard. This boiler contains very hot water under pressure. Do not unscrew any pipe fittings
nor attempt to disconnect any components of this boiler without positively assuring the water is cool
and has no pressure. Always wear protective clothing and equipment when installing, starting up or
servicing this boiler to prevent scald injuries. Do not rely on the pressure and temperature gauges to
determine the temperature and pressure of the boiler. This boiler contains components which become
very hot when the boiler is operating. Do not touch any components unless they are cool.
Respiratory Hazard. Boiler materials of construction, products of combustion and the fuel contain
alumina, silica, heavy metals, carbon monoxide, nitrogen oxides, aldehydes and/or other toxic or
harmful substances which can cause death or serious injury and which are known to the state of
California to cause cancer, birth defects and other reproductive harm. Always use proper safety
clothing, respirators and equipment when servicing or working nearby the appliance.
Failure to follow all instructions in the proper order can cause personal injury or death. read all
instructions, including all those contained in component manufacturers manuals which are provided
with the boiler before installing, starting up, operating, maintaining or servicing.
All cover plates, enclosures and guards must be in place at all times.
DangEr
Explosion Hazard. Electrical Shock Hazard. Burn Hazard. This boiler uses flammable gas, high
voltage electricity, moving parts, and very hot water under high pressure. Assure that all gas
and electric power supplies are off and that the water temperature is cool before attempting any
disassembly or service.
Do not attempt any service work if gas is present in the air in the vicinity of the boiler. Never modify,
remove or tamper with any control device.
Warning
Asphyxiation Hazard. Fire Hazard. Explosion Hazard. This boiler requires regular maintenance and
service to operate safely. Follow the instructions contained in this manual.
Improper installation, adjustment, alteration, service or maintenance can cause property damage,
personal injury or loss of life. Read and understand the entire manual before attempting installation,
start-up operation, or service. Installation and service must be performed only by an experienced,
skilled, and knowledgeable installer or service agency.
Содержание K2WT
Страница 11: ...11 107110 01 6 16 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued ...
Страница 72: ...72 Figure 9 6 Piping Method 1 Near Boiler Piping Shaded Boiler Loop IX System Piping continued ...
Страница 82: ...82 107110 01 6 16 Figure 10 4 Proper Installation of Header Sensor X Wiring continued ...
Страница 83: ...83 107110 01 6 16 X Wiring continued Figure 10 5 Internal Ladder Diagram ...
Страница 84: ...84 107110 01 6 16 X Wiring continued ...
Страница 85: ...85 107110 01 6 16 Figure 10 6 Internal Wiring Connections Diagram X Wiring continued ...
Страница 87: ...87 107110 01 6 16 Figure 10 8 TACO SR504 or Equivalent Zone Panel Wiring Connection Diagram X Wiring continued ...
Страница 88: ...88 107110 01 6 16 X Wiring continued Figure 10 9 Sage Zone Control Circulator Panel Wiring Connection Diagram ...
Страница 95: ...95 107110 01 6 16 Lighting and Operating Instructions XI Start Up and Checkout continued ...
Страница 140: ...140 107110 01 6 16 XV Repair Parts continued ...
Страница 142: ...142 107110 01 6 16 XV Repair Parts continued ...
Страница 146: ...146 107110 01 6 16 XV Repair Parts continued ...
Страница 148: ...148 107110 01 6 16 XV Repair Parts continued ...
Страница 161: ...161 107110 01 6 16 ...
Страница 162: ...162 107110 01 6 16 ...
Страница 163: ...163 107110 01 6 16 ...
Страница 164: ...164 107110 01 6 16 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...