82
Hydrostatic Implement Carrier
agria 5900 Bison
P A
After every ... operating hours
(h)
J B
2
5
8
25
50
100
200
400
600
Pa
g
e
Pa
g
e
Adjust valve play
F
BM
Clean cylinder head
F
BM
Clean and check injection
nozzle
F
Lubricate all sliding parts
9
K K 69
Lubricate bar latching pins
8
K K 64
Replace fuel hoses
W
*
BM
Replace hydraulic hoses
W
6
A
= before each start-up
B
= after each cleaning, especially with a high-pressure cleaner
BM
= See separate operating instructions for engine
F
= maintenance tasks should be performed by your
agria
service
centre
J
= at least annually
K
= inspection and maintenance tasks can be performed by the operator
P
= position in lubrication plan
R
= as required
W
= maintenance tasks can be performed by a specialist workshop
*
= after 2 years
6
= after 6 years
= petrol engine
= diesel engine
Содержание Bison 5900 Series
Страница 4: ...4 agria 5900 Bison Designation of parts Fig A Fig B...
Страница 18: ...2 Technical Data 18 Hydrostatic Implement Carrier agria 5900 Bison Wheel combinations track dimensions...
Страница 87: ...Hydrostatic Implement Carrier agria 5900 Bison 87 Declaration of Conformity...
Страница 89: ...agria 5900 Bison 89 Fig C Petrol engine...
Страница 91: ...agria 5900 Bison 91 Fig D Diesel engine...