3 Devices and Operating Elements
34
Hydrostatic Implement Carrier
agria 5900 Bison
Installing and removing implements
Ensure that the engine is switched off!
Prior to attaching and starting the implement, read and observe the operating
instructions of the implement.
Attachment:
•
The contact surfaces of machine and implement must be clean.
In a PTO-driven unit: Set the shift
lever (4) at the implement to "
O
”.
Insert the machine with the arrestor
pins (2) from below into the arrestor
hooks (3) of the implement.
Fold both eyebolts (1) over the con-
necting flange.
Attention:
•
Is the flange centring (5) correct?
•
Are the flange surface plane on
each other?
•
Tighten the cap nuts uniformly.
In a PTO-driven unit: Set the shift
lever (4) at the implement to "
I
”, allow
the strip spring shift lock (6) to engage
(if installed) - shifting is at the base
machine.
Removal
in reverse sequence.
Содержание Bison 5900 Series
Страница 4: ...4 agria 5900 Bison Designation of parts Fig A Fig B...
Страница 18: ...2 Technical Data 18 Hydrostatic Implement Carrier agria 5900 Bison Wheel combinations track dimensions...
Страница 87: ...Hydrostatic Implement Carrier agria 5900 Bison 87 Declaration of Conformity...
Страница 89: ...agria 5900 Bison 89 Fig C Petrol engine...
Страница 91: ...agria 5900 Bison 91 Fig D Diesel engine...