5 Maintenance and Repair
Hydrostatic Implement Carrier
agria 5900 Bison
69
General
Before each start-up check for escaping fuel and
oil and eliminate the cause.
- agria-Service -
Regularly check nuts and bolts for tightness and
retighten if necessary.
At least
yearly
and after cleaning:
Lubricate all sliding or moving parts (such as
speed regulating lever, hand lever bearing, etc.)
with bio lubricating grease or bio lubricating oil.
Cleaning
Machine
Clean thoroughly with water immediately after
each use.
Do not expose electric cables and components
to direct water jets.
Then lubricate all sliding parts with bio-
lubricating oil or grease with bio-lubricating
grease.
In addition lubricate the lubrication points on the
machine immediately after cleaning with a high
pressure cleaner, and put the machine briefly
into operation to press out the penetrated water.
To protect the bearings against penetrating dirt,
sap and water, there shall be a grease collar at
the bearing points.
Engine
Only clean the engine with a cloth. Do not spray
with water, as water could enter the ignition and
fuel system and cause malfunctions.
Содержание Bison 5900 Series
Страница 4: ...4 agria 5900 Bison Designation of parts Fig A Fig B...
Страница 18: ...2 Technical Data 18 Hydrostatic Implement Carrier agria 5900 Bison Wheel combinations track dimensions...
Страница 87: ...Hydrostatic Implement Carrier agria 5900 Bison 87 Declaration of Conformity...
Страница 89: ...agria 5900 Bison 89 Fig C Petrol engine...
Страница 91: ...agria 5900 Bison 91 Fig D Diesel engine...