background image

CONTENTS

General Information  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
 

Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

 

Laser Overview  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3

Power

   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

 

Charging . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

 

Removing the Battery Pack and Using Alkaline Batteries  . . . . . . . . . . . . . . . . . . . . . . . . 4

Operation

 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-9

 

Pipe Laying Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

 

Laser Start-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

 

Entering Grade . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

 

  Automatic Reset to Zero Grade . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

 

Remote Control and Line Adjustment (Azimuth) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

 

  Replacing Batteries in Remote . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

 

Adjustable Leg Set . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

 

Using the Target . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

 

Basic Set-up and Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

Applications

 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-16

 

Elevation Transfer  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

 

  Using an Automatic Level  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

 

  Using the Special Transit and Rod Group . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

 

Alignment Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11

 

  Manhole Mount with Transit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11

 

  Special Transit with Rod Group . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

 

  Stringline Method . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

 

  Plumb Bob Method . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

 

Set-up Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

 

  Height Adjustable Legs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

 

    Manhole Base Set-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

 

    In-the-pipe Set-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

 

    Invert Set-up  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

 

    Open Cut Set-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

 

  Trivet  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

 

    Manhole Base Set-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

 

  Rod and Crossbrace System  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

 

    Manhole Set-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

 

  Above Ground Set-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

Menu Options

 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-18

 

Information Available (including software version) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

 

Entering the Set-up Menu . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17   

 

Changing the Service Interval  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18

 

Deleting CHECK CAL Reminder . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18

 

Using Your Company Information for the Start-up Screen  . . . . . . . . . . . . . . . . . . . . . . 18

Troubleshooting

 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-20

 

Display Screen Explanations  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19

 

Using a Blower to Eliminate Refraction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20

Optional Equipment

 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20

Checking and Calibration

 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21-23

Safety, Care, and Handling

 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24

Warranty

 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

Important:
The operator of the GradeLight is expected to follow all operating instructions, periodically 
check  the  accuracy  of  the  unit,  and  make  checks  on  control  as  the  work  progresses. The 
manufacturer and its distributors assume no responsibility for improperly controlled work.

 

Содержание GradeLight 2700

Страница 1: ...00 Pipe Laser Owner s Manual AGL Construction Lasers Machine Control Systems 2202 Redmond Rd Jacksonville AR 72076 sales agl lasers com www agl lasers com Toll Free 800 643 9696 Phone 501 982 4433 Fax...

Страница 2: ...Manhole Base Set up 13 In the pipe Set up 13 Invert Set up 14 Open Cut Set up 14 Trivet 15 Manhole Base Set up 15 Rod and Crossbrace System 15 Manhole Set up 15 Above Ground Set up 16 Menu Options 17...

Страница 3: ...0m Accuracy 1 16 at 100 ft 5mm at 100m 10 arc sec 005 Cross Axis Leveling Manual BeamType Output Visible laser diode 635nm 5mW Class 3R Environmental IP68 nitrogen purged Power Supply 1 Rechargeable l...

Страница 4: ...Leg Reference Lines AlignTo Marks on Legs Beam Output Remote Reception Window Securing Knobs For Adjustable Legs Feet For 6 150mm Pipe Adjustable Leg Slot Beam s Horizontal Centerline Battery Pack Rel...

Страница 5: ...rade Entered Self Leveling Status Battery Status Cross Axis Level Position Lock Status of Laser and Remote Keypad The display is backlit for 30 seconds when any button is pressed on the laser or remot...

Страница 6: ...Then plug the converter into a 110V or 220V AC outlet A green LED indicates power it is not a charging indicator 3 Always place the cap back onto the charging connector to protect from dirt The laser...

Страница 7: ...lign to When the last joint of pipe has been laid approaching a manhole bring the GradeLight forward so that as soon as the manhole is in place you can set up again without delay Laser Start up Press...

Страница 8: ...ncrease to decrease For large changes hold the button Use the azimuth left or right arrows to move through the digits and to choose the next digit to be changed The digit you re working with will flas...

Страница 9: ...ote from laser keypad side beam moves in the opposite direction Activates Lock Function All buttons on the remote and laser are blocked preventing uninten tional changes when the laser is in use LCD o...

Страница 10: ...enterline in 8 10 and 12 pipe 200 250 and 300mm with the metric leg set The legs can also be adjusted to non standard heights The three leg design provides stability when setting up on uneven rough su...

Страница 11: ...for specific applica tions 1 Attach any mounting accessories to the unit such as the legs trivet handle rod mount etc Place it in the manhole or pipe at the proper offset and elevation 2 Power up the...

Страница 12: ...eal method to use when the offset hub is too far from the manhole center to transfer elevation with a batter board or other means The SpecialTransit is set up using the Rod and Crossbrace System Figur...

Страница 13: ...t is a 5 8 x 11 male attachment for mounting a standard transit The AGL SpecialTransit is mounted using an adapter assembly Aligning the beam with the AGL SpecialTransit 2 Mount the SpecialTransit and...

Страница 14: ...ront of the laser Tilt the transit down to view the target Adjust the beam left or right using the line adjustment buttons on the remote until the beam is exactly centered on the vertical crosshair Yo...

Страница 15: ...and legs if attached Apply power center the line adjustment and enter the desired grade 2 Slide the unit into the pipe It should rest on the three fixed short leg points of the housing Rough level th...

Страница 16: ...ure I Set up the unit for laying pipe as described in Manhole Base Setup in the previous section Invert Peg Set up Open Cut This method is commonly used in open ditches The cut should be excavated app...

Страница 17: ...l vial on the crossbrace to position it level Holding the two points firmly against the manhole wall extend and tighten the adjusting screw point against the opposite wall Tighten until the crossbrace...

Страница 18: ...ation at the beam centerline This measurement plus the cut at that hub will be the HI instrument height above the invert If the grade pole is used on top of the pipe allow for the height difference wh...

Страница 19: ...set to 0 hours The start up screen can be changed from AGL to your company information CALIBRATION See instructions for Adjusting Level Accuracy later in the manual SERVICE A password is needed by ser...

Страница 20: ...o down to EXIT and press ENT Repeat to leave the Set Up menu Changing AGL Start up ScreenToYour Company Information If a non AGL name is already being used follow Steps 1 2 and 5 8 to change to a diff...

Страница 21: ...als To delete this message see Set Up Mode Menu Options ERROR 0 No beam error Data error Turn laser on again turns unit off Check calibration If the automatically message appears again contact an auth...

Страница 22: ...r hour of flow sufficient to cool the pipe in about 20 minutes Glue as it dries gives off vapors These vapors are a different density and possibly different temperature than the air This also causes t...

Страница 23: ...Drive two stakes A B in line with the laser beam but low enough for the beam to pass over both stakes Stake A should be about 1 3m from the unit and stake B about 100 30m away 2 Check the instrument A...

Страница 24: ...again 2 When the AGL start up screen is displayed press the and ENT buttons simultaneously Hold until the Set Up screen appears after the Battery Check The cursor and highlighted text indicate the ac...

Страница 25: ...er Line Button and move down the menu using the Standby ZZZ Button Press the lock button instead of ENT To leave the SET UP mode move the cursor to EXIT and press ENT Final Calibration Check Re check...

Страница 26: ...ggressive or explosive environment especially gas bearing pipes is strictly prohibited Warning Never short circuit the battery contacts with any metal parts or hold the battery under water In case of...

Страница 27: ...nty is exclusive and is in lieu of all other warranties terms or conditions express or implied either in fact or by operation of law statutory or otherwise including warranties terms or conditions of...

Страница 28: ...AR 72076 sales agl lasers com www agl lasers com Phone 501 982 4433 Fax 501 982 0880 Toll Free 800 643 9696 Printed in USA AM1135 2 09 Specifications subject to change without notice CONSTRUCTION LAS...

Отзывы: