
Instrument Installation Checklist
Revision:
A.00
, Issued:
January
17
, 20
21
Document part number:
D0007550
Page ____ of ____
© Agilent Technologies, Inc. 20
21
Figure 2 Elevator mounting plate with bumper
b
Insert the four longer M4 x 18-mm mounting screws from the installation kit into the
mounting holes and slide the O-ring cups followed by the O-rings onto the mounting
screws.
Figure 3 Mounting plate with mounting screws and O-ring cups
7
Install the elevator mounting plate and drawer:
a
Place the elevator mounting plate into the enclosure aligning the mounting screws to the
holes in the enclosure and base plate.
b
Using a 3-mm hex wrench, tighten the screws until you feel a hard stop.
c
With the slides in their closed position, pull the bearing retainers forward in the slides of
the elevator mounting plate.
d
Lift the drawer and align the lead-ins on the drawer and the mounted slides in the
enclosure and slide the drawer most of the way in.
e
From the opening in the back of the enclosure, cut the cable ties holding the cables to the
cable arm and feed the cables and cable arm through the mounting hole of the cooling
unit.
f
From the front of the instrument, push the drawer into the closed position with enough
force to set the auto-close mechanism on the slides.
g
Open the drawer as needed and re-attach the bumper with the M4 screw and T-20 driver.