
Instrument Installation Checklist
Revision:
A.00
, Issued:
January
17
, 20
21
Document part number:
D0007550
Page ____ of ____
© Agilent Technologies, Inc. 20
21
Get answers. Share insights. Build connections:
Join the
Agilent Community
at
https://community.agilent.com/welcome
Service Engineer’s Responsibilities
Only complete/printout pages that relate to the system being installed.
Complete empty fields with the relevant information.
Complete the relevant checkboxes in the checklist using a “X” or tick mark “
”.
Check “Section not applicable” check boxes to indicate services/tasks not delivered, as
appropriate.
Complete the Service Review section together with the customer.
Complete the fields for page numbers at the foot of each selected page
Complete the total number of pages field in the Service Completion section
Ask the customer to sign the Service Completion section including the customer’s and your
signature.
Additional Instruction Notes
This checklist is valid for G9532A and G9532AA RapidFire 400 Systems.