Installation
8-15
k. Insert the shield cover/SDN connector assembly into the switch wall
box. Carefully loop the excess branch cable behind the shield cover and
push in as far as possible.
l.
Attach the faceplate to the switch wall box. Align the holes of the shield
cover with the switch wall box and secure the faceplate using the
screws provided.
SDN on UTP Wall Boxes Connections
Wall Box Kits for SDN on UTP are available to fit both standard U.S.
electrical wall boxes [NEMA, single or dual gang with conduit knockouts,
minimum depth = 4.0 cm (1.6 in.)] and typical European wall boxes
[minimum depth = 4.0 cm (1.6 in.)]. SDN/UTP single gang switch, Wall Box
Kits are shown below for both U.S. (Options J12 and J13) and European
(Options JJ1 and JJ2) versions. The kits include the following components.
1.
SDN/UTP shield box (with cover) for SDN connection to UTP cable PCB
assembly (compatible with world wide requirements and screened
twisted pair (STP) cable).
2.
PCB assembly (in the connector box).
3.
SDN connector for LDC cable.
4.
Black anodized ring nut on SDN connector for external identification
of SDN on UTP installation.
5.
Standard, prepunched, single gang wall plate for SDN/UTP connector.
6.
Screw connection for cable earth ground (European version).
7.
Tie wrap for use with Screened Twisted Pair (ScTP) cable only (not
shown).
Содержание 78581B
Страница 46: ...ACC Maintenance 4 2 ...
Страница 54: ...Installation Responsibilities Customer and Agilent Technologies 6 4 ...
Страница 90: ...Procedures 8 28 ...
Страница 98: ...Contacts 10 6 ...