Procedures
8-18
Procedures
ACC Procedures (78581B)
The following procedures describe the detailed steps for installing a Serial
Distribution Network (SDN) between an instrument wall box and the ACC
using UTP cable.
The customer is responsible for the following steps:
1.
Terminate UTP cable at the ACC end with RJ45 connector.
2.
Terminate UTP cable at Wall Box with a 110 edge connector (AMP).
Agilent recommends that the above steps be performed by a licensed LAN
installer who will certify the terminated UTP cable. The Agilent installer is
responsible for the following steps:
1.
Qualify UTP cable if necessary. See “Qualify UTP Cable” on page 8-21.
2.
Complete wall box installation. See “SDN on UTP Wall Boxes
Connections” on page 8-15.
3.
Perform final operational check.
Perform Final
Operational Check
1.
Plug in ACC.
2.
Inspect ACC for proper operation of LEDs.
3.
Turn on Central Station and all bedsides.
4.
Verify that all bedsides have functioning Overview screens.
5.
Verify that all bedsides are displayed at the Central Station.
If all instruments do not operate properly, use the troubleshooting
table below to correct the problem.
6.
Perform test and inspection matrix.
Symptom
Possible Cause
Corrective Action
Bed not showing at
Central Station
Bed connected to wrong branch at ACC.
Move cable to the port that is
connected to the bedside.
Bed not configured at Central Station
Configure bed at Central
Station.
No Overview capability
ACC is off
Plug in power cord.
Overview not configured On at bedside
Configure Overview On at
Bedside. Check ACC for fire
axes.
No LEDs on ACC
Defective power supply or power not
connected.
Ensure that power cord is
connected.
Replace power supply.
Содержание 78581B
Страница 46: ...ACC Maintenance 4 2 ...
Страница 54: ...Installation Responsibilities Customer and Agilent Technologies 6 4 ...
Страница 90: ...Procedures 8 28 ...
Страница 98: ...Contacts 10 6 ...