Installation
8-3
Figure 8-1. Main PCB Board LED Locations
Safety:
1.
Has the secondary ground wire been attached to the
78581B? If “No” proceed to
step 2
2.
Attach secondary ground if missing or visually
inspect ground connections at both ends of the
attached secondary ground, then proceed to
step 3.
3.
Confirm that all locations for all connected
branches are at the same ground potential.
Procedure: Measure the voltage between the ground
coming through the SDN wall box and the third wire
ground of each instrument’s wall outlet (power outlet).
The value should be less than or equal to
0.5V RMS.
-OR-
Perform Safety (1) test on all the connected devices.
• If “yes”, done and record S: P.
•
If “no”, proceed to
step 4
.
4.
Look at all bedsides for either an attached
secondary ground wire or a M1965A potential
separator connected to each bed where the voltage
was greater than 0.5V RMS.
• If “yes”, done and record S: P.
• If “no”, proceed to
step 5.
5.
Install secondary ground wire to bedside for any
connection where the ground potential was greater
than 0.5 V RMS.
Done and record S: P
.
Expected answer
is passed
S:P
or
S:F
Where P=Pass and
F=Fail.
Test Block
Name
Test or Inspection to Perform
Expected Test
Results
What to Record on
Service Record
DS1
DS2
DS4
DS3
DS8
DS7
DS5
DS6
Содержание 78581B
Страница 46: ...ACC Maintenance 4 2 ...
Страница 54: ...Installation Responsibilities Customer and Agilent Technologies 6 4 ...
Страница 90: ...Procedures 8 28 ...
Страница 98: ...Contacts 10 6 ...