Site Preparation/Installation Checklists
7-3
___
Architect aware that individual 3-wire AC outlets are
recommended for each beside instrument, each Information
Center, computer, and the ACC.
___
Cables have been identified by bed number or remote site
number and ordered after cable length from point-to-point
has been carefully measured by the hospital. Order at least
10% longer overrun to prevent a cable too short to do the job.
Refer to “Install Branch Cables” on page 8-11 for cable
ordering information, and order the associated spools to
accommodate branch cable run requirements.
NO SPLICING—CONTINUOUS CABLE RUNS ONLY.
___
Architect aware that the builder must install cables (and
cable enclosures when necessary).
___
Confirmed day scheduled for patient monitoring equipment
installation with hospital personnel assigned.
___
The “clerk of works” has a move-in day assigned for the
equipment.
Note
Go over checklist and correspondence again; it will be worth the effort!
Oversights will cause delays; delays often run costs up exponentially.
Содержание 78581B
Страница 46: ...ACC Maintenance 4 2 ...
Страница 54: ...Installation Responsibilities Customer and Agilent Technologies 6 4 ...
Страница 90: ...Procedures 8 28 ...
Страница 98: ...Contacts 10 6 ...