28
BU-0101704 R3
1. With the bin secured to the foundation, remove the bottom spacer sheet below the door by removing the
3/8” x 1–1/2” bolts and nuts (see
).
Figure 9.
Spacer Sheet
2. Slide the underfloor auger through the space underneath the bin door and align the center sump vertical
gearbox shaft hole exactly at the bin center point (C) (see
Section 6.2 – Bin Floor Preparation on page 26
).
Insert the top and bottom access panels in the center sump temporarily to aid positioning (see
EASYFLOW2 (100 SERIES) – FARM TUBE BIN UNLOAD SYSTEM