background image

Water Tank
Pressure Valves

Before Turning On the Equipment:

Page 01 - 5403132 - R06

1A -
2A -

Deliv

er
y Sys

tem

Sprint Quick Operation Guide - Description of Parts and Controls of Equipment

Observe the Scheduled Review system for your equipment.

-  Equipments made to last!

  1 - 
  2 - 
  3 - 
  4 -   
  5 - 
  6 -
  7 -
  8 -
  9 -

Zero Position
Work Position
Backrest Up (   )
Seat Down (   )
Backrest Down (   )
Seat Up (   )
On/Off Operating Light
Spittoon Bowl Flush
Progressive/Activation Pedal

Commands

1º - Check if the equipment is properly installed in accordance 
with the instructions in 

chapter 6

 of the 

User

Manual Dental Line

;

2º - Turn On the air compressor that supplies the equipment;
3º - Open the main water supply valve of the equipment;
4º - Turn On the equipment's power circuit breaker.

9

7

8

1

2

3

4

5

6

F03

Before using the equipment, please read the 

User Manual Dental Line

 carefully.

The purpose of this guide is to identify commands, parts, and instruments that may be available to the equipment, including optional items.
This guide does not define the equipment configuration that may vary according to the customer's request.

In case of loss of the 

User Manual

 and/or 

Operation Guide

, please contact us by e-mail 

 informing the serial number of your equipment.

[email protected]

Operating Lights

Control Knob
Control Rod
Sensor

1 -
2 -
3 - 

Seat Up/Position 1
Backrest Up/Position 2
Seat Down/Position 3
Backrest Down/Spit Position
Work Position
Zero Position
Progressive/Activation Pedal
Cup Filler
On/Off Operating Light
Spittoon Bowl Flush
Metal Handle

  1 - 
  2 - 
  3 - 
  4 - 
  5 - 
  6 - 
  7 - 
  8 - 
  9 - 
10 - 
11 -

R

emot

e F
oot P

edal

1A

2A

Chair Base

1B -
2B -

On/Off Switch with LED Indicator
Fuse Holder

Turning On the Equipment:

1º - Turn On the On/Off switch;
2º - Activate the "Seat Up" command on the chair base until the 
seat reaches its maximum height limit;
3º - Close the pressure valve;
4º - Remove the water tank and make sure it filled with water. If 
necessary, fill it with drinkable water up to the limit indicated in 
tank  and  reattach  it  again.  If  you  wish,  to  place  prophylactic 
products (low concentration);
5 º - Open the pressure valve  and check if the water tank is well 
attached and free of leaks;
6º - Before starting the use equipment, verify the operation of all 
instruments and commands available and perform the cleaning 
and sterilization of the instruments. 

Concept Plus

3

2

LED Premium 

1

3

Evolution Plus

1°  -  To  activate  the  Operating  Light,  press  the 
Operating Light On/Off button at the base of the 
chair  (section  Commands  -  7),  this  action  also 
enables  the  sensor  (

3

)  and  the  control  button/ 

rod (

2

);

2°  -  To  change  the  lighting  intensity  of  the 
Evolution  Plus  Operating  Light,  keep  the 
command  button  -  Commands  section  (

7

)  - 

pressed for more than 2 seconds;
3° - To turn on or off the Concept Plus and LED 
Premium  Operating  Light,  pass  your  hand  in 
front  of  the  sensor  (

3

)  at  approximately  5  cm 

distance or hold the control rod (

2

), in the case of 

Concept Plus, or turn the control button (

1

), in the 

case of the Premium LED spotlight;
4°  -  To  change  the  lighting  intensity  of  the 
Concep Plus and Premium LED reflectors, keep 

your hand in front of the sensor (

3

) or hold the control rod (

2

), in the case of Concept Plus or turn the control 

knob (

1

), in the case of the Premium LED Operating Light.

To save a work position:

1º - Press the Zero Position button;
2º - Adjust the backrest to the desired position;
3º - Adjust the seat to the desired position;
4º - Press the Work Position button for 5 seconds. The equipment will emit 2 long beeps;
5º - Press command 1 (Seat Up) while the equipment beeps; The equipment will emit 2 short beeps to 
confirm the procedure;
6º - Press the Zero Position button.

2

4

7

6

5

10

11

1

8

9

3

1B

2B

Reviews: