7
Installation
Unpacking
1.
Remove the top panel of the crate and then the 4 side
panels
2.
Inspect the DLP-2100 for damage prior to removing it
from the base of the crate
3.
Undo and remove the four M10 bolts holding the four
corners of the DLP-2100 to the base of the crate
a.
You may need to lift the crate using a forklift to
hold the nuts underneath the base that secure
the bolts
4.
Lift the DLP-2100 from the base plate using a forklift
a.
It is recommended that the front of the DLP-
2100 be facing the forklift
5.
Attach the feet to the four corners
a.
Install the feet so they are above the bottom of
the wheel ; this will allow you to roll the DLP-
2100 to the operating location
b.
The two center supports will have feet already
attached
6.
Move the DLP-2100 away from the crate base and
carefully lower to the floor
7.
Roll the DLP-2100 to the operating location
a.
Be sure the rollers are not locked before
attempting to roll the unit
8.
Lower the feet so the DLP-2100 is level and supported
by the feet
9.
Connect 220V power to the DLP-2100
Caution:
This machine is extremely heavy. Do not attempt to move the crate or
machine without suitable lifting equipment. Failure to follow these instructions may
result in serious injury.
Caution:
Use a forklift to remove the DLP-2100 from its
crate. Do not attempt to lift the unit manually!
View from underneath the crate
3
3a
5b