During installation the following points must be observed:
Prior to delivery, rotary piston machines are treated and packaged to allow for a
•
12-month storage period. If they are to remain in storage following this 12-month
period, they will need to be retreated; see storage and mothballing guidelines
TN0 1175.
Whilst the units are in storage, please ensure that they are correctly preserved,
•
packaged and, if necessary, that they undergo nitrogen replenishment in accord-
ance with TN0 1175. They must be checked every six weeks.
You must eliminate any adverse influences immediately to ensure ongoing preser
-
•
vation of the units.
Intermediate storage in dry, clean rooms that are free of vibrations.
•
The oil chambers have been sufficiently preserved for one year.
•
In the case of belt-driven machines, the V-belts should be slackened during stor-
•
age.
If the unit is to be taken out of operation for longer than six weeks, the conveying
•
chamber, piston and bright work must be preserved.
The compressor must be installed on an even foundation that does not vibrate or
•
incline.
One armature screw per machine foot/mounting hole is sufficient for this purpose.
There must be a sufficient amount of space on the installation site for mainte
-
•
nance and/or repair work. Please observe the information relating to this on the
installation drawing.
Remove all packaging material. If your machine features an acoustic hood, ensure
•
that the inlet and exhaust air louvre profiles can be accessed.
Ensure that the installation site is adequately ventilated.
•
Check that the rotary piston machine can run easily. Sluggishness indicates the
•
presence of distortion or foreign bodies.
To avoid electrostatic charging of the units, the motor, acoustic hood and base
•
frame must be earthed via the connections provided.
Fasten the piping on the discharge side and the piping on the intake side sepa-
•
rately to ensure a stable connection.
The compensator must be used for the connection to the pipeline system.
•
No forces and/or moments are permitted to act on the flange and connections.
•
Take noise protection into consideration. Piping and foundations may be stimu-
•
lated into producing natural vibrations and the associated sound emissions.
If you are planning the system in-house, the safety information, maintenance
•
information and technical documentation provided by your component suppliers
must also be observed.
The compressor unit must be carefully aligned and positioned horizontally. Opera-
•
tional safety will be affected depending on the extent of any misalignments.
Check the oil level prior to commissioning and correct if necessary.
The following standard installation conditions must be observed and ad-
hered to:
VM compressor:
-10°C ≤
t
1
≤
+50°C
-10°C ≤
t
0
≤
+50°C
(t
1
- t
0
) ≤
20 K
delta t ≤
230 K
t
2
≤
280°C