74
5.
Slide switch wires inside fuse through the
switch cutout.
6.
Mount switches in accordance with the switch
manufacturers instructions and hardware.
7. Mark location for ignition battery nylon tie
mounting hole on side of the engine box
Note:
The mounting location of the ignition
battery is left to the builder. We mount the
battery to the engine box side for ease of
installation and it can be used for additional
nose weight if needed.
8.
Roll the supplied foam rubber to make a 4
layer pad as shown. Make the pad slightly
larger than the ignition battery as shown.
Содержание 100cc YAK-54 ARF-QB
Страница 20: ...20 7 Final pushrod assembly shown below 8 Repeat installation steps for all aileron pushrods...
Страница 42: ...42 11 Install wheel pants with two mounting bolts 12 Repeat above steps for other wheel and wheel pant...
Страница 63: ...63 18 Fuel vent line installed on bottom of fuse...