12
9. Using the same method as step 8 tack the cover-
ing to the tip of the wing once again keeping it
centered on the leading edge.
10.
Once the covering has been tacked in place
work from the center out to secure the cover-
ing to the leading edge of the wing.
11. Clear covering is now fully applied.
Note:
Clear covering is centered on trim
colors. Using the same method complete
the remaining wing and stabs
IMPORTANT
It is the users responsibility to check the
covering seams and overlaps for security
and a good seal. Aeroworks is not re-
sponsible for failure of covering seams or
overlaps during flight.
This is a never ending process that
must be done after each flying
secession. Due to varying tempera-
tures and humidity changes from
day to day the covering will
continue to loosen and must be
maintained.
Содержание 100cc YAK-54 ARF-QB
Страница 20: ...20 7 Final pushrod assembly shown below 8 Repeat installation steps for all aileron pushrods...
Страница 42: ...42 11 Install wheel pants with two mounting bolts 12 Repeat above steps for other wheel and wheel pant...
Страница 63: ...63 18 Fuel vent line installed on bottom of fuse...