29
5.
Align the left and right sides of the control
horns to the mounting holes and mount using
six wood screws as shown.
Rudder Servos Installation
1. Gather the two rudder servos (min 180 in./oz.)
and a Y harness as shown below.
Note:
If using a higher Torque (
min 300 in./oz
.)
Digital, Metal geared servo, only one servo is
required.
2.
Attach the Y harness to aft rudder servo leads
and secure with safety wire, string, tape, or
other method. Ensure the connectors will not
come apart from vibration or light tension.
3.
Install the aft rudder servo with the output
shaft forward. Pull the servo lead and Y har-
ness up through the forward servo cutout. At-
tach the Y harness to the forward servo rudder
servo leads and secure with safety wire, string,
tape, or other method. Ensure the connectors
will not come apart from vibration or light ten-
sion. Install the forward rudder servo with the
output shaft forward.
Содержание 100cc YAK-54 ARF-QB
Страница 20: ...20 7 Final pushrod assembly shown below 8 Repeat installation steps for all aileron pushrods...
Страница 42: ...42 11 Install wheel pants with two mounting bolts 12 Repeat above steps for other wheel and wheel pant...
Страница 63: ...63 18 Fuel vent line installed on bottom of fuse...