
Chapter 6 The High Capacity HiveManager Platform
72
Aerohive
7. From the front of the equipment rack, guide the chassis rails on the sides of the HiveManager into the inner
slides. Then push the HiveManager into the rack until the front mounting brackets are flush against the front
rack rails.
8. Using four screws
—
two for each of the front brackets
—
fasten the HiveManager to the equipment rack as shown
in
Figure 6
. If the rack has round holes, use the two remaining nut bars (and locator pins) and thread the screws
through the rack rails into them.
Figure 6
Mounting the HiveManager in an Equipment Rack
The HiveManager is now securely mounted to the front and rear rails of the equipment rack.
Screws
Front
Mounting Bracket
Rack Rails
Outer Slide
Inner Slide (over
the chassis rail)
Rear
Mounting Bracket
Screws
Front
Mounting Bracket
Rack Rails
Outer Slide
Inner Slide (over
the chassis rail)
Rear
Mounting Bracket
Содержание HiveAP 20
Страница 1: ...Aerohive Deployment Guide...
Страница 33: ...Chapter 2 The HiveAP 20 ag Platform 32 Aerohive...
Страница 61: ...Chapter 4 The HiveAP 340 Platform 60 Aerohive...
Страница 77: ...Chapter 6 The High Capacity HiveManager Platform 76 Aerohive...