Chapter 6 The High Capacity HiveManager Platform
70
Aerohive
R
ACK
M
OUNTING THE
H
IGH
C
APACITY
H
IVE
M
ANAGER
Use the rack mounting kit to mount the High Capacity HiveManager in a standard 19" (48 cm) equipment rack. The
rack mounting kit contains the following items:
•
(2) slide sets (each consisting of an outer slide, inner slide, and chassis rail)
•
(2) rear mounting brackets
•
(4) bar nuts
•
(4) locator pins
•
(6) slot-head machine screws with 8-32 threads
–
for attaching the mounting brackets to the outer slides
•
(14) cross-head machine screws with 10-32 threads
–
for attaching the chassis rails to the HiveManager, and
the front and the rear mounting brackets to equipment rack rails with tapped holes or to the enclosed bar
nuts when the rack rails have round holes
1. After checking that the mounting kit contains the above parts, separate the chassis rails from each slide set, as
shown in
Figure 2
.
Figure 2
Separating the Chassis Rail from the Nested Slides
2. Position one of the chassis rails so that the slide stop is near the HiveManager mounting bracket near the front
panel and the front and rear holes in the chassis rail align with the holes in the side of the HiveManager. Use
three of the cross-head screws to secure the chassis rail to the HiveManager chassis as shown in
Figure 3 on
page 71
.
Note:
Because of the weight of the device (34 lb./ 15.42 kg without rails) , two people are required to rack
mount it safely.
Ñ«¬»® Í´·¼»
ײ²»® Í´·¼»
ݸ¿--·- ο·´
Û¨¬»²¼ ¬¸» ¬»´»-½±°·²¹ °·»½»- ±º ¬¸»
-´·¼» -»¬ ¬± ¬¸» ´»º¬ ¿²¼ ®·¹¸¬ò
Ñ«¬»® Í´·¼»
ײ²»® Í´·¼»
ݸ¿--·- ο·´
Í©·ª»´ ¬¸» ½¿¬½¸ ¬± ®»´»¿-» ¬¸» ½¸¿--·- ®¿·´ô
¿²¼ ¬¸»² -´·¼» ·¬ ½±³°´»´»¬»´§ ¿©¿§ º®±³ ¬¸»
²»-¬»¼ -´·¼»-ò
Ì«®² ±ª»®ò
Ý¿¬½¸
Содержание HiveAP 20
Страница 1: ...Aerohive Deployment Guide...
Страница 33: ...Chapter 2 The HiveAP 20 ag Platform 32 Aerohive...
Страница 61: ...Chapter 4 The HiveAP 340 Platform 60 Aerohive...
Страница 77: ...Chapter 6 The High Capacity HiveManager Platform 76 Aerohive...