Chapter 7 The AP340 Platform
78
Aerohive
Figure 14 Clipping the hanger frame onto the track
6. Insert the hanger clip upward through the center slot in the hanger frame, and then twist it
counterclockwise until the clip snaps into a locked position against the sides of the crossbar (see
Figure 15 Securing the AP340 to the hanger frame
7. Connect one or two Ethernet cables to the network, and—if not using PoE—connect the power cord to
a power source.
8. Replace the ceiling tile to complete the installation.
Hanger frame
5
4
Remove the ceiling tile and
enter the plenum.
Press the hanger frame onto
the ceiling track.
(Bird’s eye view with the ceiling
tiles and ceiling tracks removed
for clarity)
AP attached to the mounting plate
6
Insert the hanger clip up through the
center slot in the hanger frame.
Rotate the AP and the attached
mounting plate counterclockwise
until the clip locks in place against
the sides of the crossbar.
Hanger frame
Hanger frame
Содержание Aerohive AP141
Страница 1: ...Aerohive Hardware Reference Guide ...
Страница 7: ...Contents 6 Aerohive ...
Страница 17: ...Chapter 1 AP121 and AP141 Platforms 16 Aerohive ...
Страница 31: ...Chapter 2 The AP170 Platform 30 Aerohive ...
Страница 49: ...Chapter 4 AP330 and AP350 Platforms 48 Aerohive ...
Страница 63: ...Chapter 6 BR200 and BR200 WP Routers 62 Aerohive ...
Страница 107: ...Chapter 10 The High Capacity HiveManager 106 Aerohive ...
Страница 111: ...Index 110 Aerohive ...