![Aerco BOILER MANAGEMENT SYSTEM II 5R5-384 Скачать руководство пользователя страница 25](http://html.mh-extra.com/html/aerco/boiler-management-system-ii-5r5-384/boiler-management-system-ii-5r5-384_installation-operation-and-maintenance-instructions-manual_2861530025.webp)
INSTALLATION
Figure 2-10. Sample RS485 (Modbus) Network For Benchmark or KC1000 Boilers
BMS II
485 B (+)
485 A (-)
SHLD
(TERM. 3)
TO OTHER
NETWORK
BOILERS
(3 – 9)
NOTE
THE LAST BCM SLAVE ON THE RS485 LOOP MUST
HAVE ITS TERMINATION RESISTOR (T) ACTIVATED.
REFER TO GF-115-C FOR MORE INFORMATION.
THE BIAS SWITCHES IN THE BMS II SHOULD BOTH
BE TURNED “ON”.
SET BOTH
SWITCHES
TO “ON”
BIAS
SWITCHES
B (+)
P/O BCM (Y2)
NETWORK BOILER 1
1
2 A (-)
MODBUS
B (+)
P/O BCM (Y2)
NETWORK BOILER 2
1
2 A (-)
MODBUS
Figure 2-11. Sample RS485 (Modbus) Network For Modulex Series Boilers
2-13
Содержание BOILER MANAGEMENT SYSTEM II 5R5-384
Страница 8: ......
Страница 12: ......
Страница 16: ...INSTALLATION ...
Страница 17: ...INSTALLATION 2 5 ...
Страница 21: ...INSTALLATION ...
Страница 32: ...OPERATION Figure 3 2 BMS II Menu Structure 3 4 ...
Страница 46: ......
Страница 64: ......
Страница 70: ......
Страница 72: ......
Страница 73: ...APPENDIX E E 1 APPENDIX E _____________________________ BMS II WIRING DIAGRAM ...
Страница 74: ......
Страница 76: ......
Страница 84: ......
Страница 88: ...APPENDIX H H 4 A _ ...
Страница 98: ......