Table 3-6: Combustion Cal Menu
Menu Item Display
Available Choices or Limits
Default
Minimum
Maximum
CAL Voltage 18%
.25
10.0v
1.00v
CAL Voltage 30%
.25
10.0v
2.30v
CAL Voltage 45%
.25
10.0v
2.95v
CAL Voltage 60%
.25
10.0v
3.60v
CAL Voltage 80%
.25
10.0v
5.30v
CAL Voltage 100%
.25
10.0v
9.10v
SET Valve Position
0%
100%
0%
Blower Output
Monitor Blower Output
Voltage
.00v
3.9 START SEQUENCE
When the Control Box
ON/OFF
switch is set to the ON position, it checks all pre-purge safety
switches to ensure they are closed. These switches include:
•
Safety Shut-Off Valve Proof of Closure (POC) switch
•
Low Water Level switch
•
High Water Temperature switch
•
High Gas Pressure switch
•
Low Gas Pressure switch
•
Blower Proof switch
•
Blocked Inlet switch
If all of the above switches are closed, the
READY
light above the
ON/OFF
switch will light and the
unit will be in the Standby mode.
When there is a demand for heat, the following events will occur:
NOTE
If any of the Pre-Purge safety device switches are open, the appropriate fault
message will be displayed. Also, the appropriate fault messages will be
displayed throughout the start sequence, if the required conditions are not
observed.
1. The DEMAND LED status indicator will light.
2. The unit checks to ensure that the Proof of Closure (POC) switch in the downstream Safety
Shut-Off Valve (SSOV) is closed. See Figure 3-3 for SSOV location.