APPENDIX I – RECOMMENDED PERIODIC TESTING
OMM-0046_0J
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
Page
163
of
168
GF-123
Ph.: 800-526-0288
06/018/2015
APPENDIX I – RECOMMENDED PERIODIC TESTING CHECK LIST
WARNING
PERIODIC TESTING OF ALL BOILER CONTROLS AND SAFETY
DEVICES IS REQUIRED TO DETERMINE THAT THEY ARE
OPERATING AS DESIGNED. PRECAUTIONS SHALL BE TAKEN
WHILE TESTS ARE BEING PERFORMED TO PROTECT AGAINST
BODILY INJURY AND PROPERTY DAMAGE. THE OWNER OR USER
OF AN AUTOMATIC BOILER SYSTEM SHOULD SET UP A FORMAL
SYSTEM OF PERIODIC PREVENTIVE MAINTENANCE AND
TESTING. TESTS SHOULD BE CONDUCTED ON A REGULAR BASIS
AND THE RESULTS RECORDED IN A LOG-BOOK.
Item
Frequency
Provided By
Remarks
Refer to indicated paragraphs of this manual for detailed procedures
Gauges, monitors
and indicators
Daily
Operator
Visual inspection and record readings in
operator log
Instrument and
equipment settings
Daily
Operator
Visual check against factory recommended
specifications
Weekly
Operator
Verify factory settings
Firing Rate Control
Semi-Annually Service Tech. Verify factory settings
Annually
Service Tech.
Check with combustion calibration test
equipment. See paragraph 7.4 and Chapter
4.
Flue, vent, stack or
intake air duct
Monthly
Operator
Visually inspection condition and check for
obstructions
Spark Igniter
Weekly
Operator
See paragraph 7.2
Air/Fuel Valve
position
Weekly
Operator
Check position indicator dial (paragraph 3.9)
SSOV Leakage test
Annually
Service Tech.
Check for leakage in accordance with the
SSOV manufacturer’s (Siemens)
recommendations.
Flame failure
Weekly
Operator
Close manual gas shutoff valve and check
safety shutdown. See paragraph 6.7
Flame signal
strength
Weekly
Operator
Check flame strength using the Control
Panel Operating Menu. See paragraph 3.4.
Low water level cut
off and alarm
Weekly
Operator
See paragraph 6.4