
2
WWW.AEM-TEST.COM
[email protected] | Version # : 2.2
TestPro CV100
User Manual
TestPro CV100 Features
4
4
1 Settings
a. Date and Time
b. Sleep Mode
c. Power Off
d. Display & Audio
e. Language
f. Y-Axis Direction
g. Units
h. Result Autosave
i. Auto Start
j. Long Cable
k. License Details
l. Device Specifications
m. Unit Type
n. Storage
o. Battery Info
p. Reset Battery Gauge
q. Restore Default Factory Settings
r. Factory Menu
s. USB
Contents
i. Copy Test Results to USB
ii. Import Label List
iii. Creating CustomLabel
iv. Copy License
v. Upgrade Firmware
vi. Export Project
vii. Import Project
13
13
13
14
14
14
14
15
15
16
i. Create Project & Profile
ii. Switch Projects
iii. Clone A Projects
iv. Delete A Project
b. LiveWiremap
c. Cable Set Reference
d. Cable Test Limit
e. Cables & Connectors
i. Select A Cable & Connector
ii. Add New Cable
i. Create New Label
ii. Import Custom Label
g. Operator
h. Performing Cable Autotest
i. Save Autotest Results
j. DC Resistance
k. Single Ended Autotest
l. Tone Generator
m. Learn NVP
n. Length Test
o. Shield Discontinuity Test
p. AD-NET-CABLE Certification Test
q. MPL Certification Test
16
16
16
17
17
17
18
18
19
19
19
20
20
20
21
21
22
a. Multimode Launch Verification
b. Fiber Set Reference
i. One/Two/Three Jumper Method
ii. Fiber Dual Ended Set Reference
iii. Fiber Loopback Set Reference
c. Fiber Test Setup
d. Fiber Test Limit
e. Fiber Configuration
f. Fiber Cable
g. Fiber Connector
h. Performing Fiber Autotest
i. Save Autotest Results
j. Visual Fault Locator (VFL)
k. Light Source & Power Meter
l. Fiber Inspection
m. Hybrid Power & Fiber Certification Test
n. Fiber PoE DC Resistance Test
i. Fiber PoE DC Set Reference
ii. Fiber PoE DC Resistance Test
4 Multi-Gig, PoE and BASE-T Test
22
23
23
24
24
25
25
26
26
26
26
27
27
26
27
28
28
28
29
29
a. Creating Project/Profile
b. Adjusting Test Limits
c. Selecting Cable/Connector
d. Validation Test Options
29
30
30
31