
23
PD201808 AEG GRID-TIED THREE-PHASE SOLAR INVERTER (12-30 kW) V.2-18 EN
23
3.4 Electrical installation
This section illustrates the detailed electrical installation and related safety instructions for AEG inverter series AS-IC01
and AS-IC01-2.
Figure 12: Block diagram of a grid-tied solar system
Improper operation during the wiring process can cause fatal injury to the operator
or unrecoverable damage to the inverter. Only qualified personnel can perform
the wiring work.
All electrical installations must be in accordance with local and national electrical codes.
All cables must be firmly attached, undamaged, properly insulated and
adequately dimensioned.
Read and follow the instructions provided in this section while observing all safety warnings.
Always note the rated voltage and current defined in this manual. Never exceed the limits.
3.4.1 Connection of solar modules
Figure 13A: Connection between DC connector and solar modules
Solar modules
QF
SPD
AEG solar inverter
QF Net meter
SPD
QF
Public electric grid
Monitoring equipment
Communication converter