![AE AIR50-2230A Скачать руководство пользователя страница 74](http://html.mh-extra.com/html/ae/air50-2230a/air50-2230a_operation-manual_2859399074.webp)
AIR50-2230A Operation Manual
Project Maintenance Process
52
13.4
Grease replacement
Operation machine J1 axis to J6 axis reducer, every 11520 hours or 3 years
(whichever is shorter), need to replace the internal grease.
Grease type and grease quantity, please refer to
Table 13-1 Manipulator grease model and grease amount
Operator model
Replace the grease
part
Amount of
grease
Grease type
AIR50-2230A
J1 axis reducer
2823g
VIGOGREASE RE0
J2 axis reducer
1572g
J3 axis reducer
1309g
J4 axis gear case and
reducer
1139g&589g
J5 axis reducer
268g
J6 axis reducer
190g
When replacing the grease, please refer to
operator:
Table 13-2 Change the posture of the operator
Replace the grease
part
J1
J2
J3
J4
J5
J6
J1 axis reducer
0°
Arbitraril
y
Arbitrarily
Arbitrarily
Arbitrarily
Arbitrarily
J2 axis reducer
Arbitrarily
0°
Arbitrarily
Arbitrarily
Arbitrarily
Arbitrarily
J3 axis reducer
Arbitrarily
0°
90°
Arbitrarily
Arbitrarily
Arbitrarily
J4 axis gear case
and reducer
Arbitrarily
0°
90°
0°
Arbitrarily
Arbitrarily
J5 axis reducer
Arbitrarily
0°
90°
0°
0°
Arbitrarily
J6 axis reducer
Arbitrarily
0°
90°
0°
0°
0°
Warning
◼
Reducer oil temperature may be higher than 90°
, to be replaced after
cooling.
◼
Wear gloves to prevent allergic reactions.
Содержание AIR50-2230A
Страница 2: ...AIR50 2230A Operation Manual V 1 4 ...
Страница 21: ...AIR50 2230A Operation Manual Catalogue iii Appendix B Table of screw strength and tightening torque Nm 75 ...
Страница 22: ......
Страница 98: ......