![AE AIR50-2230A Скачать руководство пользователя страница 71](http://html.mh-extra.com/html/ae/air50-2230a/air50-2230a_operation-manual_2859399071.webp)
AIR50-2230A Operation Manual
Project Maintenance Process
49
Check and repair process for internal cables of base
Check and repair process as follows:
1.
Remove the electrical mounting plate as shown inFigure 13-2, and pull out
the internal cables of base.
2.
Check if the fixing plate secures the cables on the mounting plate.
3.
Check the fixation between the cables and fixing plate for wear or
damage.
4.
Check the internal cables for wear or damage.
5.
In case of crack, wear or damage, please contact us for replacement
timely.
6.
Check if the lubricating grease on the internal cable surface has
disappeared.
7.
If so, it shall be replenished timely.
8.
The cable in the base to keep the shape "U" type like the Figure 13-1.
9.
Install the cover plate, and coat the joint surface between the cover plate
and base with sealant
Figure 13-2 Inner cable of the base
inner cable of the base
cover plate
M5 screw
Содержание AIR50-2230A
Страница 2: ...AIR50 2230A Operation Manual V 1 4 ...
Страница 21: ...AIR50 2230A Operation Manual Catalogue iii Appendix B Table of screw strength and tightening torque Nm 75 ...
Страница 22: ......
Страница 98: ......