you have issues or problems operating your unit after you have followed the first
time operation guidelines.
You can monitor your unit with a system (user-supplied) controller or a Windows
®
-
based personal computer running Thyro-Tool Pro PC. To order this software, contact
your AE sales representative.
OPERATING MODES
Full-Wave Switch (TAKT)
In full-switch mode, whole multiples of the mains periods are always switched and
harmonics are minimized.
The mains are switched on/off depending on the prescribed time period.
Ts = switch-on time
To = full-wave period
Figure 5‑32. TAKT waveform
The start and stop ramp functions can be used in TAKT mode. Ramps are used with
the operation of large single loads to reduce pulse-shaped mains loads and therefore
to reduce voltage variations. The ramps are implemented by applying periods with
phase-angle firing, using the parameters SST and SDN (see the following figure).
Full-wave period 1
Full-wave period 2
Figure 5‑33. Start/stop ramp waveform
Advanced Energy
®
Thyro-PX® Power Controller
57010148-00B
Installation, Setup, and Operation
5‑32