background image

4

61287737F3-13A

Step 5: Connect Power

Plug the supplied 12 V AC/DC Power Converter into the 

PWR

 

connection on the rear of the ONT. Connect the power plug to a 
standard 120 VAC outlet.

Using a UPS

The ONT can typically use an Uninterruptible Power Supply 
(UPS) if desired. Power is supplied to the ONT by a local power 
source with battery backup that uses the AC power at the 
customer premises to maintain the charge on the battery. The 
UPS powers the ONT and functions as a battery back-up unit 
(BBU) supplying continuous 12 VDC. For installation instructions, 
refer to the installation material provided with the UPS.
If a UPS is disconnected while in use, the ONT is not protected 
from power outages and will send a “Battery Missing” alarm to the 
OLT.

Connecting a UPS

Connect the UPS to the 8-pin MOLEX connector labeled “UPS” 
located on the rear of the SFU ONT chassis. 

Figure 4

 represents 

the MOLEX connector.

Figure 4. UPS Connector

The UPS Power/Alarm Connections Table below provides a pin-
out for the connector.
ADTRAN offers a UPS Cable assembly (P/N: 1287402G1) for this 
connector.

ON/OFF Button

An 

ON/OFF

 button is located on the far-left side of the rear of the 

ONT. User functionality is limited to this button.

Pin-Out

Description

Alarm

1

Power Input (+12 VDC)

-

2

UPS Status - On Battery

1

3

UPS Status - Battery Missing

2

4

Signal Return

5

Power 12 V Return

-

6

UPS Status - Replace Battery

3

7

UPS Status - Low Battery

4

8

No Connection 

8

7

6

5

4

3

2

1

Step 4: Install Fiber

C

     

CAUTION!

     

LASER RADIATION

1310 nm to 1490 nm

Do not view directly with optical instruments.

This product contains a Class 1 Laser module that complies 
with FDA 21 CFR 1040.10, 1040.11 and IEC 60825-1.

Fiber is installed in an SC connecter located behind a removable 
protector panel (labeled “Fiber Port”) on the right-rear of the ONT. 
Refer to 

Figure 3

.

g

     NOTE

Figure 3

 does not apply to all installations. Some ONT units have 

a screw; others have a protective cover that simply slides off in 
the direction of the arrow on the cover.

1. If equipped, remove the Phillips-head screw from the right 

side of the fiber protector panel.
Slide the protector cover back to expose the SC connector.

Figure 3. Fiber Installation

2. Clean the ends of the incoming fiber at the SC connection.
3. Before installing the fiber, use an optical power meter to 

measure the optical power. The level should not exceed –8 
dBm. Use an appropriate bi-directional optical attenuator if 
the power levels are at or above –8 dBm. A level between 

–12 and –27 dBm is acceptable.

4. Connect the incoming fiber cable to the SC connection.
5. Route the fiber cable through the slot in the protective cover 

and slide it back into place.

6. Replace and secure the panel (use the Phillips screw if 

equipped).

Protective Cover

SC Connector

Screw

Содержание Total Access 324E

Страница 1: ...tionally by a customer provided Uninterruptible Power Supply UPS AC DC Power Adapter The power feed is supplied through a 12 VDC Power Adapter that is included with the ONT The Power Adapter operates from a wall socket input of 100 240 VAC 50 60 Hz with a nominal output of 12 VDC The total power consumption with 4 Ethernet Ports running and both POTS lines off hook is approximately 13 0 Watts UPS ...

Страница 2: ...ion test set PON power meter with wavelength filtering Fiberscope or videoscope Two 8 Pan Head screws 1 inch or greater in length Assorted tie wraps for securing cabling and wiring Fiber optic connections require the following Fiber optical fusion splice tools ODC Fiber cleaning tool SC Fiber connector Installation Steps To install the ONT complete the following steps Step 1 Position the ONT The O...

Страница 3: ...ailure to deploy as described could result in permanent damage from lightning or other electrical events and voids the Warranty If it is necessary to connect the ports to remote outdoor equipment or between structures then add an appropriate protection device per the following ADTRAN s Ethernet Port Protection Device EPPD P N 1700502G1 must be connected between the unit and the outside plant cable...

Страница 4: ...n Battery 1 3 UPS Status Battery Missing 2 4 Signal Return 5 Power 12 V Return 6 UPS Status Replace Battery 3 7 UPS Status Low Battery 4 8 No Connection 8 7 6 5 4 3 2 1 Step 4 Install Fiber C CAUTION LASER RADIATION 1310 nm to 1490 nm Do not view directly with optical instruments This product contains a Class 1 Laser module that complies with FDA 21 CFR 1040 10 1040 11 and IEC 60825 1 Fiber is ins...

Страница 5: ...the ONT Electrical Nominal Voltage 12 0 VDC Minimum Voltage 10 0 VDC Maximum Voltage 13 9 VDC Power Consumption 1 06 Amps 12 0 VDC AC Power Included Switching Adapter input range of 100 240 VAC 50 60 Hz with a nominal output of 12 VDC Optical TX min power 5 5 dBm TX max power 1 0 dBm RSSI max sensitivity 27 0 dBm RX overload 8 dBm TX wavelength 1310 nm typical RX wavelength 1490 nm typical Physica...

Страница 6: ...opyright 2020 ADTRAN Inc All Rights Reserved ADTRAN CUSTOMER CARE From within the U S 1 888 423 8726 From outside the U S 1 256 963 8716 PRICING AND AVAILABILITY 1 800 827 0807 61287737F3 13A Documentation for ADTRAN Network Solutions products is available for viewing and download directly from the ADTRAN Support Community website Go to https supportforums adtran com welcome Registration is requir...

Отзывы: